
S1
2.3 Electrical Connection
6
TRANS-ATS.D three phase connections schematic
1- Connect the unit as shown in the appropriate diagram. Be sure to connect the battery
supply the right way round and battery negative should be grounded.
2- Current transformers secondary should be grounded.
!
FUSE
FUSE
FUSE-5, FUSE-6
FUSE-3, FUSE-4 8 A. T
FUSE-7 6 A. T
FUSE-8 Max. 10 A. T
-1,
-2,
2 A. T
35
21
22
BATTERY -
B
40
42
41
5A
B
34
33
BA
TTER
Y
-
32
31
30
29
28
Configurable Input-2
Remote Start 2 or
Configurable Output-6
5A
USB
FUSE-7
FUSE-8
Configurable Output-3
39
38
37
36
Configurable Output-4
TRANSIST
OROUTPUTS
MAX.1
A
BA
TTER
Y
+
Emergency Stop or
Configurable Input-1
6
2
7
3
8
8A
8A
1
4
9
10
5
L1
S2:(GENERA
T
OR)
S1:(MAINS)
L2
L3
N
LOAD
S2
L1
L2
L3
N
Elec
tric
a
lin
te
rlo
c
k
Me
c
h
a
n
ica
lin
te
rlo
c
k
13
14
15
16
Source 1
Contactor
Relay
Source 2
Contactor
Relay
FUSE 1
-
FUSE 2
-
FUSE 3
-
FUSE-4
FUSE-5
FUSE-6
Output-1
Configurable
Max.300V
V
Max.300V
V
BA
TTER
Y
+
Configurable Input-6
Source 2 Ready or
Configurable Input-8
Configurable Input-5
Output-2
Configurable
Configurable Input-3
Configurable Input-4
L1
L2
L3
N
1
!
2
!
Remote Start 1 or
Configurable Output-5
Configurable Input-7
44
45
43
A(+)
B(-)
RS-485
(Optional)