www.enviromaster.com
Side Discharge Condensers
9
inStallation inStrUCtionS
reFrigerant piping
Continued
2. Protect the valves by wrapping with a
wet rag "heat sink" before brazing.
3. We recommend the use of a shield (can
be made from some scrap metal) to
protect the paint.
4. Braze tubing into fittings.
1. Clean the ends of tubing and insert into
fittings.
5. Attach manifold set.
6. Evacuate line to 500 microns or less to
ensure all moisture has been removed
and there are no leaks.
Refrigerant
refer to refrigerant
Charge table for
specified line charge.
7. Once certain of a good evacuation and
leak free joints, back-seat the valves
(counter-clockwise) to open and allow
factory charge to fill lines and indoor unit.
S1C
Shown
S1C
Shown
S2C
Shown
S1C
Shown
S1C
Shown
Manifold
Vaccum Pump Micron Gage
manifold Setup For evacuation
S1C
Shown
S2C
Содержание AmericaSeries S1C2
Страница 12: ...www enviromaster com Side Discharge Condensers 12 SINGLE ZONE OPERATION CHARTS...
Страница 13: ...www enviromaster com Side Discharge Condensers 13 SINGLE ZONE OPERATION CHARTS...
Страница 14: ...www enviromaster com Side Discharge Condensers 14 SINGLE ZONE OPERATION CHARTS...
Страница 15: ...www enviromaster com Side Discharge Condensers 15 SINGLE ZONE OPERATION CHARTS...
Страница 16: ...www enviromaster com Side Discharge Condensers 16 SINGLE ZONE Heat Pump OPERATION CHARTS...
Страница 17: ...www enviromaster com Side Discharge Condensers 17 SINGLE ZONE Heat Pump OPERATION CHARTS...
Страница 18: ...www enviromaster com Side Discharge Condensers 18 Dual ZONE OPERATION CHARTS...
Страница 28: ...Phone 1 800 228 9364 Fax 1 800 232 9364 5780 Success Drive Rome NY 13440...