Figure 2-9: Probe Mounting for Metal Wall Stack or Duct Construction
A. Minimum diameter hole in wall.
B. Stack or duct metal wall.
C. Weld or bolt mounting plate to metal wall of stack or duct. Joint must be airtight.
Figure 2-10: Probe Mounting for Masonry Wall Stack Construction
A. Field weld pipe to mounting plate.
B. Pipe 88,9 mm (3.5 in.) sched 40 pipe sleeve (not by Emerson) length by customer
C. Masonry stack wall
D. Outside wall surface
E. Joint must be airtight.
F. Bolt mounting plate to outside wall surface.
Install
Reference Manual
October 2019
00809-0100-4880
32
Emerson.com/Rosemount
Содержание Rosemount Oxymitter DR
Страница 1: ...Reference Manual 00809 0100 4880 Rev AB October 2019 Rosemount Oxymitter DR In Situ Oxygen Probe ...
Страница 4: ...4 ...
Страница 52: ...Startup and operate Reference Manual October 2019 00809 0100 4880 52 Emerson com Rosemount ...
Страница 66: ...Maintenance and service Reference Manual October 2019 00809 0100 4880 66 Emerson com Rosemount ...
Страница 72: ...Troubleshoot Reference Manual October 2019 00809 0100 4880 72 Emerson com Rosemount ...
Страница 74: ...Return material Reference Manual October 2019 00809 0100 4880 74 Emerson com Rosemount ...
Страница 84: ...Replacement parts Reference Manual October 2019 00809 0100 4880 84 Emerson com Rosemount ...
Страница 94: ...Declaration of Conformity Reference Manual October 2019 00809 0100 4880 94 Emerson com Rosemount ...
Страница 95: ...Reference Manual Declaration of Conformity 00809 0100 4880 October 2019 Rosemount Oxymitter DR 95 ...
Страница 96: ...Declaration of Conformity Reference Manual October 2019 00809 0100 4880 96 Emerson com Rosemount ...
Страница 97: ...E China RoHS table Reference Manual China RoHS table 00809 0100 4880 October 2019 Rosemount Oxymitter DR 97 ...