Figure 5-29: Step 13
14. To install preamplifier housing hold preamplifier housing over pickup coil, connect
and hand tighten the cable connector to pickup coil.
a) Lower explosion proof housing over pickup coil and tighten collar nut of the
quick connect union.
Figure 5-30: Step 14
NOTICE
When an XIHL or GUB2 enclosure is fitted, the coupling flame path must be checked
and must not exceed 0.15 mm (0.006").
5.3
Parts inspection
Clean and inspect all parts for damage and wear. Replace parts as required. Clean
bearings, journals and thrust washers with solvents and paper towels. Assemble dry. Do
not spray lubricants as either a cleaner or a lubricant.
Upstream and downstream cones should have sharp edges free of nicks. Thrust washers
should be seated flat in cone recesses.
Installation and maintenance instructions
Disassembly and assembly instructions
3-9008-011
October 2019
Installation and maintenance instructions
53
Содержание Daniel PT
Страница 2: ...2 ...
Страница 10: ...Contents Installation and maintenance instructions October 2019 3 9008 011 x Daniel PT Liquid Turbine Meters ...
Страница 12: ...Plan Installation and maintenance instructions October 2019 3 9008 011 12 Daniel PT Liquid Turbine Meters ...
Страница 24: ...Install Installation and maintenance instructions October 2019 3 9008 011 24 Daniel PT Liquid Turbine Meters ...
Страница 32: ...Operate Installation and maintenance instructions October 2019 3 9008 011 32 Daniel PT Liquid Turbine Meters ...
Страница 38: ...Maintain Installation and maintenance instructions October 2019 3 9008 011 38 Daniel PT Liquid Turbine Meters ...
Страница 55: ...Installation and maintenance instructions 3 9008 011 October 2019 Installation and maintenance instructions 55 ...