Figure 5-21: Step 5
6. Place journal on shaft over threads. Wipe outside surface with a clean cloth.
Figure 5-22: Step 6
7. Clean bearing inside surface. Slide rotor on to shaft and journal, simultaneously
sliding journal and rotor along shaft to upstream cone.
Note
Install rotor in same direction as disassembled.
Note
If bi-directional rimmed rotor meter install deflector ring after installing rotor.
Installation and maintenance instructions
Disassembly and assembly instructions
3-9008-011
October 2019
Installation and maintenance instructions
49
Содержание Daniel PT
Страница 2: ...2 ...
Страница 10: ...Contents Installation and maintenance instructions October 2019 3 9008 011 x Daniel PT Liquid Turbine Meters ...
Страница 12: ...Plan Installation and maintenance instructions October 2019 3 9008 011 12 Daniel PT Liquid Turbine Meters ...
Страница 24: ...Install Installation and maintenance instructions October 2019 3 9008 011 24 Daniel PT Liquid Turbine Meters ...
Страница 32: ...Operate Installation and maintenance instructions October 2019 3 9008 011 32 Daniel PT Liquid Turbine Meters ...
Страница 38: ...Maintain Installation and maintenance instructions October 2019 3 9008 011 38 Daniel PT Liquid Turbine Meters ...
Страница 55: ...Installation and maintenance instructions 3 9008 011 October 2019 Installation and maintenance instructions 55 ...