5
Disassembly and assembly
instructions
5.1
3" through 24" PT Meter disassembly
Procedure
1. To remove preamplifier housing, unscrew collar nut on the quick connect union, lift
preamplifier housing, unscrew and disconnect cable connector from pickup coil.
Figure 5-1: Step 1
2. To remove pickup coil, unscrew from coil boss.
Note
Preamplifier housing and pickup coil need not be removed for internal meter
disassembly.
Installation and maintenance instructions
Disassembly and assembly instructions
3-9008-011
October 2019
Installation and maintenance instructions
39
Содержание Daniel PT
Страница 2: ...2 ...
Страница 10: ...Contents Installation and maintenance instructions October 2019 3 9008 011 x Daniel PT Liquid Turbine Meters ...
Страница 12: ...Plan Installation and maintenance instructions October 2019 3 9008 011 12 Daniel PT Liquid Turbine Meters ...
Страница 24: ...Install Installation and maintenance instructions October 2019 3 9008 011 24 Daniel PT Liquid Turbine Meters ...
Страница 32: ...Operate Installation and maintenance instructions October 2019 3 9008 011 32 Daniel PT Liquid Turbine Meters ...
Страница 38: ...Maintain Installation and maintenance instructions October 2019 3 9008 011 38 Daniel PT Liquid Turbine Meters ...
Страница 55: ...Installation and maintenance instructions 3 9008 011 October 2019 Installation and maintenance instructions 55 ...