Downstream hanger assembly installation
Figure 9-13:
8.
Install the downstream shaft nut, simultaneously holding the upstream shaft nut to
prevent the shaft from turning.
Downstream shaft nut installation
Figure 9-14:
Important
The shaft nut can only be reused up to five times. Replace as needed.
Planned maintenance
80
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Содержание daniel 1500 series
Страница 1: ...User manual P N 3 9008 515 Rev D July 2016 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 8: ......
Страница 12: ...Plan 2 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 64: ...Prepare the turbine meter for use 54 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 66: ...Install 56 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 72: ...Installation procedure 62 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 74: ...Testing 64 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 75: ...Part III Operate Operate User manual 65 ...
Страница 76: ...Operate 66 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 80: ...Maintain 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 101: ...Decommission the turbine meter User manual 91 ...
Страница 102: ...Decommission the turbine meter 92 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 103: ...Decommission the turbine meter User manual 93 ...