26
D22001956 - v.0 - UPD 020210
4 - OPERATING THE MACHINE
The pivoting model allows the operator to work in 4 different positions: from completely vertical to completely
horizontal (fig.7, page 3). In order to modify the position, remove the fixing pin, position the machine as desired, therefore, re-
insert the pin in the relative hole and secure it with the ‘R’-shaped spring (fig.7).
•
The log splitter, in compliance with standard EN 609-1, is activated with a two hand control:
the machine will function only when both the
levers are activated together (2 in fig.1, page 2).
•
Never use the log splitter if it is not in perfect order or if it needs servicing. Before starting work, check correct functioning of all the safety devices
(two hands control and switch-off button).
•
Before starting work, check the integrity of the flexible pipes and the lack of leaks in the connections, check the level of the hydraulic oil in the tank
and top up if necessary with one of the oils indicated on page 29.
The oil level must be between the two notches on the oil dipstick (10 in fig.1, page 2)
•
Before starting work, switch on the log splitter and let the oil warm up for a few minutes.
4.1.A - For machines with electric motor (SPL 910 T)
If the motor does not run in the correct direction, invert two of the phases in the socket. Remove the plug from the log splitter. Insert a suitably sized
slot head screwdriver in the slot located inside the plug of the switch as shown in figure 3, page 2. Exert slight pressure, turn the white disc by
180°. This operation physically inverts two poles on the three-phase motor.
Check that the motor runs in the correct direction as indicated by the arrow.
Never open the box containing the switch, or open the terminal block on the motor. If it is necessary to do so, have
these operations carried out by your electrician.
If the fuses blow or the protection valve trips, this means that you are overloading the motor or the electrical installation is not correctly rated. Consult
your electrician.
4.1.B - For machines with premium graded fuel engine (SPL 910 SC)
•
Before operating the log splitter, carefully read the user’s manual for the engine fitted. study the maintenance regulations and guarantee supplied.
•
Check the oil level in the engine block. top up if necessary.
WARNING
: working without oil causes irreparable damage.
•
When the engine is new, it is important, at first start-up, to let it turn over without performing any work for at least twenty minutes. this running-
in period ensures maximum performance and smooth operation of the whole system.
4.1.C - For machines driven by cardan shaft (SPL 910 PTO)
WARNING
Use CE-marked cardan shaft only. Carefully follow the manufacturer operating instructions
•
Make sure the tractor is off, that the parking brake is on and if necessary that the wheels are chocked.
•
Connect the log splitter to the three points of the tractor.
•
Connect the cardan shaft to the gearbox (C in fig.8c, page 4) to the power take-off of the tractor. The cardan shaft must be of suitable length and
complete with protective cover. Check that it clicks into place.
•
Make sure that the control levers are in neutral position.
•
After connecting the log splitter, start the tractor and check that the cardan shaft turns in the direction indicated on the data plate on the gearbox
(see par. 1.1 “SYMBOLS USED”).
•
Position the accelerator at a suitable rpm for your tractor so that the engine provides sufficient power for correct functioning of the log splitter and
check that the power take-off does not exceed 440 rpm as shown on the data plate.
WARNING
Follow the few very important rules indicated above to avoid problems that could cause injury or damage.
WARNING
Never touch the cardan shaft or any other rotating parts. This is extremely dangerous and may cause injury or damage.
ENGLISH
Содержание SPL 910 PTO
Страница 2: ...2 D22001956 v 0 UPD 020210 3 5 max 107 cm 10 30 cm 2 4 1 ...
Страница 3: ...3 D22001956 v 0 UPD 020210 6a 6b 7 6c 6d ...
Страница 4: ...4 D22001956 v 0 UPD 020210 8d 8e 8f SPL 910 T SPL 910 SC SPL 910 PTO 8a 8b 8c ...
Страница 5: ...5 D22001956 v 0 UPD 020210 9a 9b 10 11 ...
Страница 6: ...6 D22001956 v 0 UPD 020210 12b 12a 13 14 ...
Страница 20: ...20 D22001956 v 0 UPD 020210 ...
Страница 32: ......
Страница 44: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......