EM TEST
PFS 200 Series
Manual for Operation
V 3.08
7 / 34
2.2.
Rear view
1
Test supply OUTPUT
2
Test supply PF1
3
Reference ground connection
4
Test supply PF2
5
Ventilation
6
Control voltage 0-10V
7
Ext. Trigger
8
Mains selector
9
Power on switch
10
Parallel interface
11
Serial interface
12
CN interface not used
13
Fail detection Fail1 / 2
1
Test supply output
Additionally to the output at the front panel of the simulator the test supply output is also available at the rear
part. This output is mostly used for rack-mounted equipment.
2
Test supply PF1
The power supply for the EUT is connected to the banana conn / -. The power supply is connected
to channel PF1. See par. 4 and 5 for connecting diagrams and detailed information.
3
Reference ground connection
4
Test supply PF2
The power supply for the EUT is connected to the banana conn / - . The power supply is connected
to channel PF2. See par. 4 and 5 for connecting diagrams and detailed information.
5
Ventilation
After long-term duration tests with maximum load current the generator should keep on running for some
minutes, to cool down the system.
6
Control voltage 0-10V
The voltage is used to control external power sources. The source normally is connected to the channel
PF2. The voltage level can be selected via the operating panel of the PFS.
7
BNC EXT. TRIGGER
One single event can be released. Trigger level +5 to +15V positive going.
8
Mains selector
Selection 115V / 230V.
9
Power on switch
The switch is part of the mains filter. Mains fuses are part of the filter 230V/1A or 115V/2A