
EM TEST
Compact NX5
Operating Manual
V 1.06
21 / 143
3.5.
System configuration
This chapter describes how to configure the compact NX5 generator to work with the EUT and the
connected accessories. The software library includes all accessories with their parameters. Some
parameters must be matched to the current device. For device, that is not existing in the library, the user
has to create one by modify an existing equipment.
Procedure
The following system configuration is a short instruction guide. For detail setting refer to the related
chapters in this manual.
1. Power ON the compact NX5 generator
2. EUT configuration setup
3. System settings
4. Transformers settings
5. External coupler settings
NOTE: If you have ordered the complete NX5 System from EM TEST, the System configuration was
completed in the EM TEST factory in Switzerland
3.5.1. Power ON the compact NX5 generator
Approx. 3-4 seconds after power on the generator will drive the ventilator at full speed during few
seconds. Then the ventilator returns to a variable speed control concerning the temperature.
Booting
After the welcome screen the software scans the
equipment for search all existing internal
phenomenon’s and external devices.
A list shows and list all detected modules.
Home screen
after booting
The home screen shows all detected symbols of
phenomenon with their color.
Next steps:
1. EUT configuration setup
2. Menu / Setup
for
- System settings
- Transformer settings
- External coupler settings
EUT configuration Setup
Supply:
AC
Coupling: 1 phase set
to
L, N, PE
Path:
PF1
Vnom:
230 V
(115 V)
Limit:
all disabled
NOTE: For detailed information
see chapter 4.3.5. EUT Setup
Содержание compact NX5 bp-1-300-16
Страница 142: ......
Страница 143: ...EM TEST Compact NX5 Operating Manual V 1 06 143 143 16 4 Main diagram high voltage connection ...