
EM TEST
CNI 501 / CNI 503
Manual of operation
V 3.32
25 / 41
6.5.
test setup with CNI 501 BS3 or CNI 503B7.5
The generator UCS 500N7.6 controls either the 3-phase CNI 503B7.5 or 1-phase CNI 503BS3. The 1-phase CNI
501BS3 is installed outside the Test-rack on a table. Before testing, the following connections between the
CNI 503B7.5 and CNI 503BS3 must be rearranged.
Earth cable
: The earth cable is screwed to the park position
inside the rack. The earth cable must be fixed at
the CNI 501B3.
Sync cabel
:
The AC synchronization must be connected to the
socket L1 at CNI 501BS3. The end of the sync
cables at the UCS side are designed, that only one
synchronization cable can be connected at the
UCS sync plug.
HV - COM
:
The twisted Surge high voltage cable must be
connected to the HV-COM connectors between the
switching network and the generator.
EFT Burst
:
The coaxial HVE cable (1m) must be connected on
the front sides of the devices.
Figure 6.12
Figure 6.13
1
Surge cable HV-COM to CNI 501BS3
2
Sync cable to CNI 503BS3
3
Earth connection Rack to CNI 501BS3
4
CN control cable for control the CNI 501BS3
5
Surge cable HV-COM to CNI 503B7.6