Maintenance
49
10. Check that the O-rings all round form a uniform impression of approx. 2 mm on the reagent
tube and that there is no leak on the O-ring caused by the glass wool.
11. Confirm the message on the ELEMENTS software so that the pressure can be built up
again.
The reagent tube on the front of the analyzer has been inserted.