Installation
32
The Autoloader is screwed to the analyzer as follows:
1. Ensure that the front cover has been removed, see
”.
2. Remove the mounting brackets (
1
) and (
6
) from the Autoloader and remove the sliding
blocks from them.
3. Latch the sliding blocks into the analyzer profile and screw the mounting brackets loosely
onto this.
4. Screw the mounting brackets at the back (
1
) and front (
6
) onto the Autoloader.
The position can be adjusted horizontally using the adjusting screws (
2
) and (
5
).
5. Press the locking screw (
3
) at the back against the mounting bracket and initially screw the
locking screw in loosely.
6. Press the locking screw (
4
) at the front against the mounting bracket and initially screw the
locking screw in loosely.
The Autoloader has been prepared for alignment.
5.7 Establishing the compressed air supply
The compressed air supply is established using the supplied compressed air hose and a tee.
See “
” for details of the compressed air supply.
Establish the compressed air supply as follows:
1. Ensure that the Autoloader has been set up, see
”.
2. Connect the supplied compressed air hose to the back of the Autoloader, see Pos. (
1
) in
”.
3. Connect the other end of the compressed air hose to the tee.
4. Connect the second compressed air hose to the tee and to the compressed air supply on
the analyzer.
The Autoloader has been connected to the compressed air supply.
5.8 Establishing communication with the analyzer
Communication with the analyzer is established using the supplied cable.
See “
” for details of the port for communicating with the analyzer.
Establish communication with the analyzer as follows:
1. Ensure that the Autoloader
has been set up, see “
”.
2. Connect the supplied data connection cable to the data connection on the back of the
Autoloader, see Pos. (
3
) in
”.
3. Connect the other end of the data connection cable to the analyzer data connection (see
the analyzer manual).
Communication with the analyzer has been established.