Commissioning
39
6
Commissioning
The following conditions must be met before commissioning:
•
The Autoloader has been installed, see
”.
Commission the Autoloader as follows:
1. Turn the Autoloader on by the main switch, see Pos. (
2
) in
“
Operating side
”.
The Status LED on the main switch of the Autoloader lights up.
The Autoloader has been commissioned.