background image

1. Prepare the installation area by sweeping the area 

completely clean.

2. Framing pocket must be sized according to the 

information provided in the Framing Diagram. It is 

recommended that the front studs at each side 

be doubled for added strength. Framing must be 

extremely square and plumb in order to accomplish 

a successful installation.
3. Install hot and cold water supply lines with the 

control valve. Mount to the framing.

4. It is extremely important that the floor area 

intended for the installation be flat and level. 

Any areas over 1/8" out-of-level will prevent the 

installation from being successful. If an area out more 

than 1/8" is found, float the floor area with a floor 

leveling compound. This material must be placed 

and cured (dry) before proceeding with the shower 

installation.
5.

 A special note:

 During handling and transport, the 

product may be slightly bent. It is very important that 

the seam side of each wall, and the threshold of the 

pan does not have any bow or bend. This product is 

engineered with materials that allow for the sections 

to be pressed back to the normal and straight 

factory form that is intended.

As each section is removed from the packaging, 

use a straight edge to check the straightness of 

the wall sections and of the threshold. An example 

of checking the threshold is illustrated in Figure 2A. 

Check all the parts, and if not straight, follow the 

procedures outlined below to bring the parts back 

into the intended condition.
In the event they are not straight to 1/16", pressure 

can be applied to the top side of the material. This 

can be accomplished by placing blocks under the 

two extreme corners.

Always place a soft rag on the finished surface where 

it contacts the wood blocks, and under your feet to 

avoid damaging the finish.

Gently step on this area and allow your body weight 

(Up to 250 pounds), to flex the material back straight. 

Confirm straightness, repeat if necessary until +/- 

1/16" is accomplished. Figures 2B and 2C

A complete dry fit for the shower base and walls is 

recommended. A dry fit in this instance is defined as 

securing the sections to the studs with no silicone and 

minimal screws to confirm a good fit, and the framing 

accommodates the sections. To achieve a dry fit 

installation, proceed with steps 6 through 23 without 

using the silicone, floor adhesive and minimal screws to 

secure to the framework.

Installation Instructions   

 

 

1 of 12

6.

Carefully measure the framing pocket to  assure it is of    
proper size for the unit to be installed. Refer to

dimensional information in the Framing Diagrams on 

Page 3, Figure 1. 

5.

A special note: During handling and transport, 

the product may be slightly bent. It is very important

that the seam side of each wall, and the threshold of the
pan does not have any bow or bend. This product is 
engineered with materials that allow for the sections to be
pressed back to the normal and straight factory form that 
is intended. 

7.

Check the framing pocket for square. Check to assure
the vertical studs are plumb. To have tight seams where

the parts meet, it is very important that the framing pocket

be exceptionally square and plumb.

Check for square by holding a measuring tape from the
back left corner to the front right corner, as shown in
Figure 4. Repeat for the other side. If both dimensions are

the same, the framing is square. Adjust if necessary.

As each section is removed from the packaging, use a
straight edge to check the straightness of the wall sections
and of the threshold. An example of checking the threshold
is illustrated in Figure 2A. Check all the parts, and if not
straight, follow the procedures outlined below to bring the 

parts back into the intended condition.

In the event they are not straight to 1/16”, pressure can be
applied to the top side of the material. This can be 
accomplished by placing blocks under the two extreme
corners. 

Always place a soft rag on the finished surface where it
contacts the wood blocks, and under your feet to avoid

damaging the finish. 

Gently step on this area and allow your body weight 
(Up to 250 pounds), to flex the material back straight. 
Confirm straightness, repeat if necessary until +/- 1/16” 

is accomplished.   (Figures 2B and 2C)  

Once the dry fit has been done and the fit confirmed, 
disassemble the components. Resume step 5 and follow

each step carefully. 

A complete dry fit for the shower base and walls is 
recommended. A dry fit in this instance is defined as 
securing the sections to the studs with no silicone and 
minimal screws to confirm a good fit, and the framing
accommodates the sections. To achieve a dry fit 
installation, proceed with steps 6 through 23 without using
the silicone, floor adhesive and minimal screws to secure

to the framework. 

4     

Figure 3

Figure 4

Figure 2C

Figure 2B

Figure 2A

www.ellasbubbles.com 

Page 5 

11/13

Содержание 3838 BF 4P.5

Страница 1: ...75 Center 6030 BF 5P 1 0 Right Left 6036 BF 5P 875 Center 5430 BF 4P 1 0 Right Left 6033 BF 5P 1 0 Right Left 6036 BF 5P 1 0 Right Left Representing these Barrier Free Roll in Shower model numbers 604...

Страница 2: ......

Страница 3: ...tarted Tools and Materials 1 Planning your Installation 2 3 Framing Diagrams 4 Installation Instructions 5 16 Collapsible Dam Instructions 17 19 Warranty Information 20 Warranty Activation Form 21 22...

Страница 4: ......

Страница 5: ...0 1 1 4 wood screws solid wood flooring adhesive 2 one gallon buckets per shower or 100 silicone adhesive 2 gallons of water for mixing bedding compound and water test around drain tube of white bathr...

Страница 6: ...an the size of the shower This product is manufactured to tight specifications The 1 4 over sizing is for maneuvering and installation ease If 1 4 over is not reasonable sizing closer to the product a...

Страница 7: ...installing on the one piece back wall or side wall Plan for routing the water supply lines to the control valve installation location 5 In the installation location the drain opening in the floor shou...

Страница 8: ...6036 L R 6060 6048 6036 C 6238 6232 A B C D 38 7 8 48 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 62 5 8 62 5 8 62 5 8 38 1 2 19 3 8 31 5 16 32 1 2 16 3 8 30 1 8 61 1 4 30 1 8 30 1 8 4...

Страница 9: ...e silicone floor adhesive and minimal screws to secure to the framework Installation Instructions 1 of 12 6 Carefully measure the framing pocket to assure it is of proper size for the unit to be insta...

Страница 10: ...f cardboard in the floor of the shower to protect the floor during the additional steps of installation There is a cut out for this on the pan box Installation Instructions 2 of 12 9 Once the shower p...

Страница 11: ...sition to the back framing Use a piece of scrap 2 x 4 lumber to temporarily secure it See the example in Figure 12 Installation Instructions 3 of 12 12 The next step is to permanently install the show...

Страница 12: ...entire installation process though step 23 must continue If for any reason the installation cannot be completed within the working time of the adhesive after step 16 jump ahead to step 23 Non shrink...

Страница 13: ...te the valve installation and connection to hot and cold water supply at this time Also complete shower supply connection Strap pipes to framing if required This is the last access to the plumbing bef...

Страница 14: ...larger than 1 8 will be present where the side walls mate the back wall Use wood shims or furring strips to fill any space between the back wall flange and the studs Align the wall section where it me...

Страница 15: ...ts on the bottom of the wall Clear your fingers and slide the wall panel toward the back wall Make sure the alignment pins in the back wall index into the holes on the side wall See Figure 24 When sea...

Страница 16: ...h opening no larger than 1 8 Figure 27 Installation Instructions 8 of 12 11 24 Now that all wall panels are installed remove the protective cardboard from the floor and use a 2 foot level to re check...

Страница 17: ...and securely tighten each of the six 6 screws THIS COMPLETES THE INSTALLATION OF THE SEAT INSTALLATION INSTRUCTIONS FOR GRAB BARS Recommended tools for installation 1 4 Power Drill 1 8 drill bit when...

Страница 18: ...manufactured units are designed with a radius where the floor transitions or meets the wall This is to ensure proper structural strength where the wall meets the floor The installation of end caps is...

Страница 19: ...alcohol 2 Verify the required length anticipating the vertical rise making certain there is enough retainer strip to make a vertical rise on the end walls 3 Determine and mark center point of shower...

Страница 20: ...ace 9 Before removing remainder of orange peel off strip stretch retainer to opposite wall mark and template for proper location proceeding final cut 10 Remove remaining orange peel off strip and stre...

Страница 21: ...tifying proper mounting location It will be helpful to determine whether your fiberglass reinforced shower unit has a small molded ridge or water runoff assist design on your unit You will find this f...

Страница 22: ...le today ORDER THE CORRECT LENGTH Make sure you have ordered the correct length See chart below The water retainer strip is designed to travel along the floor to the wall radius until vertical then ca...

Страница 23: ...17 Tile Application Grout Line joints The grout joints or entire outer edge beneath the retainer must be caulked to prevent soap and shower debris from lodging beneath the retainer The adhesive tape...

Страница 24: ......

Страница 25: ...carry a thirty 30 year limited warranty against manufacturing defects This warranty shall be voided if the unit is moved from its place of initial installation or is not installed in accordance with t...

Страница 26: ......

Страница 27: ...tions test by using a 2 food level from the drain to all adjacent walls All cure times for bonding sealing agents have been properly observed and the customer has been clearly notified and instructed...

Страница 28: ...taller s Name _______________________________________________ Address City State ZIP ____________________________ ________________________________ Telephone E mail ___________________________ ________...

Отзывы: