background image

Installation Instructions  

 

 

7 of 12 

Pre-drill holes and attach with screws along the top back flange into the framing studs. 

Make sure the two wall panels are in alignment and are level and plumb. Place level or 

straight edge on both vertical flange where the wall will mate to the back wall and check 

to assure there are no gaps. (For the 4836 four piece which has a single piece back wall 

panel, skip this step).

23. If the water control valve is located on one of the side walls, it is important to dry trial fit 

that panel first. Carefully measure and mark the location of the valve on the surface of the 

side wall. Read the installation instructions provided by the valve manufacturer. Carefully 

drill the valve hole(s).

Trial fit the side wall panel to the shower pan. Wipe clean the side ledge. This next step is a 

two person job.
Lift the side wall panel and set it on the ledge. Set the panel so it is within one inch of the 

vertical back wall seam. Make sure the pins in the pan index with the slots on the bottom 

of the wall. Clear your fingers and slide the wall panel toward the back wall. Make sure the 

alignment pins in the back wall index into the holes on the side wall. See Figure 24
When seated, the seam should have a minimal gap of 1/8" or less. If not, push the end of 

the side panel until the vertical seam closes. See Figure 25 When in place, check the fit of 

the valve hole. Adjust size and location if required.
When the fit is good, lift the wall panel away. Complete the valve installation and 

connection to hot and cold water supply at this time. Also complete shower supply 

connection. Strap pipes to framing if required. This is the last access to the plumbing before 

the wall is permanently installed.

Clean the side ledge and apply a continuous 3/8" bead of100% RTV silicone caulking 

along the entire length of the mating ledge of the shower pan. Apply the caulk completely 

around each alignment pin.

Clean and apply a continuous 3/8" bead of 100% RTV silicone caulk along the entire length 

of the vertical surface of the back wall where the side wall panel mates to the back wall. 

Apply the caulk completely around each alignment pin. See Figure 23

www.ellasbubbles.com 

Page 11 11/13

Содержание 3838 BF 4P.5

Страница 1: ...75 Center 6030 BF 5P 1 0 Right Left 6036 BF 5P 875 Center 5430 BF 4P 1 0 Right Left 6033 BF 5P 1 0 Right Left 6036 BF 5P 1 0 Right Left Representing these Barrier Free Roll in Shower model numbers 604...

Страница 2: ......

Страница 3: ...tarted Tools and Materials 1 Planning your Installation 2 3 Framing Diagrams 4 Installation Instructions 5 16 Collapsible Dam Instructions 17 19 Warranty Information 20 Warranty Activation Form 21 22...

Страница 4: ......

Страница 5: ...0 1 1 4 wood screws solid wood flooring adhesive 2 one gallon buckets per shower or 100 silicone adhesive 2 gallons of water for mixing bedding compound and water test around drain tube of white bathr...

Страница 6: ...an the size of the shower This product is manufactured to tight specifications The 1 4 over sizing is for maneuvering and installation ease If 1 4 over is not reasonable sizing closer to the product a...

Страница 7: ...installing on the one piece back wall or side wall Plan for routing the water supply lines to the control valve installation location 5 In the installation location the drain opening in the floor shou...

Страница 8: ...6036 L R 6060 6048 6036 C 6238 6232 A B C D 38 7 8 48 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 60 1 4 62 5 8 62 5 8 62 5 8 38 1 2 19 3 8 31 5 16 32 1 2 16 3 8 30 1 8 61 1 4 30 1 8 30 1 8 4...

Страница 9: ...e silicone floor adhesive and minimal screws to secure to the framework Installation Instructions 1 of 12 6 Carefully measure the framing pocket to assure it is of proper size for the unit to be insta...

Страница 10: ...f cardboard in the floor of the shower to protect the floor during the additional steps of installation There is a cut out for this on the pan box Installation Instructions 2 of 12 9 Once the shower p...

Страница 11: ...sition to the back framing Use a piece of scrap 2 x 4 lumber to temporarily secure it See the example in Figure 12 Installation Instructions 3 of 12 12 The next step is to permanently install the show...

Страница 12: ...entire installation process though step 23 must continue If for any reason the installation cannot be completed within the working time of the adhesive after step 16 jump ahead to step 23 Non shrink...

Страница 13: ...te the valve installation and connection to hot and cold water supply at this time Also complete shower supply connection Strap pipes to framing if required This is the last access to the plumbing bef...

Страница 14: ...larger than 1 8 will be present where the side walls mate the back wall Use wood shims or furring strips to fill any space between the back wall flange and the studs Align the wall section where it me...

Страница 15: ...ts on the bottom of the wall Clear your fingers and slide the wall panel toward the back wall Make sure the alignment pins in the back wall index into the holes on the side wall See Figure 24 When sea...

Страница 16: ...h opening no larger than 1 8 Figure 27 Installation Instructions 8 of 12 11 24 Now that all wall panels are installed remove the protective cardboard from the floor and use a 2 foot level to re check...

Страница 17: ...and securely tighten each of the six 6 screws THIS COMPLETES THE INSTALLATION OF THE SEAT INSTALLATION INSTRUCTIONS FOR GRAB BARS Recommended tools for installation 1 4 Power Drill 1 8 drill bit when...

Страница 18: ...manufactured units are designed with a radius where the floor transitions or meets the wall This is to ensure proper structural strength where the wall meets the floor The installation of end caps is...

Страница 19: ...alcohol 2 Verify the required length anticipating the vertical rise making certain there is enough retainer strip to make a vertical rise on the end walls 3 Determine and mark center point of shower...

Страница 20: ...ace 9 Before removing remainder of orange peel off strip stretch retainer to opposite wall mark and template for proper location proceeding final cut 10 Remove remaining orange peel off strip and stre...

Страница 21: ...tifying proper mounting location It will be helpful to determine whether your fiberglass reinforced shower unit has a small molded ridge or water runoff assist design on your unit You will find this f...

Страница 22: ...le today ORDER THE CORRECT LENGTH Make sure you have ordered the correct length See chart below The water retainer strip is designed to travel along the floor to the wall radius until vertical then ca...

Страница 23: ...17 Tile Application Grout Line joints The grout joints or entire outer edge beneath the retainer must be caulked to prevent soap and shower debris from lodging beneath the retainer The adhesive tape...

Страница 24: ......

Страница 25: ...carry a thirty 30 year limited warranty against manufacturing defects This warranty shall be voided if the unit is moved from its place of initial installation or is not installed in accordance with t...

Страница 26: ......

Страница 27: ...tions test by using a 2 food level from the drain to all adjacent walls All cure times for bonding sealing agents have been properly observed and the customer has been clearly notified and instructed...

Страница 28: ...taller s Name _______________________________________________ Address City State ZIP ____________________________ ________________________________ Telephone E mail ___________________________ ________...

Отзывы: