5
4
3
2
IMPORTANT
1
Pack Contents
150mm
Centres
1.0
5.0
Pressure
BAR
0.2
4.0
2.0 3.0
Pressure
BAR
1.0
5.0
0.2
4.0
2.0
3.0
60°C
65°C
Specifications
Maximum Static Pressure:
10.0 bar
Inlet Water Temperature
15mm
Compression
Inlet Connections
Min:
0.2 bar
Max:
5.0 bar
Working Pressures
The inlet hot water must be at
least 10°C above the required
blend temperature.
Factory pre-set
42°C
Inlet Dimensions
5°C
25°C
Cold Water Supply
Min:
5°C
Max:
25°C
Hot Water Supply
Tools You’ll need
Flat head
Screwdriver
Cross head
Screwdriver
Hexagonal Keys Socket Spanner
Pipe Cutter
Pencil
Drill
Spanner
Installation Instructions
& User Guide
Please leave these instructions
with the end user
Product Code: AR2 SHXVOFF C (D2)
All products manufactured and supplied by Bristan are safe to use provided that
they are installed, operated and receive regular maintenance in
accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999 and
current by-laws. For full Installation Requirements & Notes (IRN) please
visit
wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease of future
maintenance.
Before installing this product the water supply must be thoroughly flushed in
order to remove any swarf, solder etc.
This product must not be modified in any way as this will invalidate the
guarantee.
Full access must be made available for future maintenance/servicing purposes.
Before drilling into walls, check that there are no hidden electrical wires,
cables or water supply pipes. This can be checked with the aid of an
electronic detector.
If power tools are used do not forget to:
-
Wear
eye
protection
- Unplug equipment after use
If in doubt, contact a registered plumber or your Local Water Authority or
the Secretary of the Institute of Plumbing, address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Prior to Installation
Installation
60-65°C Recommended
Identify the required positition of the
valve and prepare the water supply pipes.
Supply pipes should be 150mm apart.
Using the backplate supplied with the
wallmount, mark and drill holes.
REMEMBER
hot on the left,
cold on the
right
150mm C
entr
es
Secure the rubber backplate
and backplate into place.
Secure the isolator
onto the backplate
ensuring the olive is
positioned over the
pipework correctly.
Push shrouds to the
back of the wall outlet,
securing them against
the rubber fixing plate
Rotate the shroud until
the opening aligns with
the isolation screw.
Turn the screw to isolate
the water. Reverse the
process when turning
the water back on.
REMEMBER
To service
your
product!
1
Isolation
2
Remove the concealing
cap from the shroud.
Secure the shower to
the wall mount.
TMV DESIGNATION
HP-S High Pressure - Shower
LP-S Low Pressure - Shower
21mm
x2
x2
x2
x1