background image

5

4

3

2

IMPORTANT

1

Pack Contents

150mm

Centres

1.0

5.0

Pressure

BAR

0.2

4.0

2.0 3.0

Pressure

BAR

1.0

5.0

0.2

4.0

2.0

3.0

60°C

65°C

Specifications

Maximum Static Pressure: 

10.0 bar

Inlet Water Temperature

15mm 

Compression

 

Inlet Connections

Min: 

0.2 bar

Max: 

5.0 bar

Working Pressures

The inlet hot water must be at 

least 10°C above the required 

blend temperature.

Factory pre-set

42°C

Inlet Dimensions

5°C

25°C

Cold Water Supply

Min: 

5°C

 Max: 

25°C

Hot Water Supply

Tools You’ll need

Flat head  

Screwdriver

Cross head  

Screwdriver

Hexagonal Keys Socket Spanner

Pipe Cutter

Pencil

Drill

Spanner

Installation Instructions 

& User Guide

Please leave these instructions 

with the end user

Product Code: AR2 SHXVOFF C (D2)

All products manufactured and supplied by Bristan are safe to use provided that 
they are installed, operated and receive regular maintenance in  
accordance with these instructions. 

This product needs to be installed in accordance with, and meet the  
requirements of the Water Supply (Water Fittings) Regulations 1999 and  
current by-laws. For full Installation Requirements & Notes (IRN) please  
visit 

wras.co.uk/directory. 

Isolation valves must be fitted to the inlet water supplies to ensure ease of future 
maintenance.  

Before installing this product the water supply must be thoroughly flushed in 
order to remove any swarf, solder etc. 
 
This product must not be modified in any way as this will invalidate the  
guarantee. 

Full access must be made available for future maintenance/servicing purposes.

Before drilling into walls, check that there are no hidden electrical wires,  
cables or water supply pipes. This can be checked with the aid of an  
electronic detector. 

If power tools are used do not forget to:  
    - 

Wear 

eye 

protection

 

 

 

 

- Unplug equipment after use

If in doubt, contact a registered plumber or your Local Water Authority or  
the Secretary of the Institute of Plumbing, address as follows:-

The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791

Prior to Installation

Installation

60-65°C Recommended

Identify the required positition of the 

valve and prepare the water supply pipes. 

Supply pipes should be 150mm apart.

Using the backplate supplied with the 

wallmount, mark and drill holes.

REMEMBER 

hot on the left, 

cold on the 

right

150mm C

entr

es

Secure the rubber backplate 

and backplate into place.

Secure the isolator 

onto the backplate 

ensuring the olive is 

positioned over the 

pipework correctly.

Push shrouds to the 

back of the wall outlet, 

securing them against 

the rubber fixing plate

Rotate the shroud until 

the opening aligns with 

the isolation screw.

Turn the screw to isolate 

the water. Reverse the 

process when turning 

the water back on.

REMEMBER 

To service 

your 

product!

1

Isolation

2

Remove the concealing 

cap from the shroud.

Secure the shower to 

the wall mount.

TMV DESIGNATION

HP-S High Pressure - Shower

LP-S Low Pressure - Shower

21mm

x2

x2

x2

x1

Отзывы: