05306004
Page
Notice
Date
INSTALLATION
MANUAL
1
7
1004
L1
L1
L2
L2
L3
L3
D0789
D0790
Operating inspection
The operating inspection must be done by an approved technician.
WARNING
Always make sure that the fan is rotating in the right direction.
The fan must rotate in the direction shown on the arrow glued
inside the right compartment (see illustration).
7. Operating inspection
If it is rotating in the wrong direction,
invert two of the three phases on the
power supply isolating switch to reverse
the direction of rotation of the fan.
Check again the direction of rotation of
the fan. Allow the machine to run with the
heating on for 5 minutes, and check on
the control panel to ensure that the
heating is working correctly.
If the tests carried out on the various
points mentioned above are satisfactory,
the machine is ready for use.
Содержание FC48
Страница 1: ...05306004 GB 26 2019 Installation manual Finishing cabinet FC48 Translated from french ...
Страница 2: ......
Страница 34: ... ...
Страница 35: ... ...
Страница 36: ...Share more of our thinking at www electroluxprofessional com ...