INSTALLATION
MANUAL
8
6
1004
6. Installation/
Putting into service
TABLE OF CORRESPONDENCES - Finishing cabinet FC48
Category
Type
Working
Ø of
Pressure at
Heat
Consumption
Consum-
index
of
supply
Hi
injectors
injectors
emission
ption
gas
pressure
Qn in kW
Mn in
Vn in
in mbar
in mm
(Hi)
kg**
m³**
*
2E, 2H, G 20
20
34,02
3,30
184 mmH
2
O
20
-
0,23
2ESI
MJ/m³
or 18 mbar
2L, 2ESI
G25
25
29,25
3,70
184 mmH
2
O
20
-
0,27
MJ/m³
or 18 mbar
3 P
G31
37
46,34
2,20
regulator out
20
0,16
-
MJ/kg
of operation
3 P
G31
50
46,34
2,10
regulator out
20
0,16
-
MJ/kg
of operation
* For Belgium, no work is allowed between G20 and G25.
Note : G20 (H) =
natural gas, Lacq type
(20 mbar)
G25 (L) =
natural gas, Groningue type
(20 or 25 mbar)
G31 =
propane gas
(37 or 50 mbar)
**8 min typical cycle : 8 60/40 polyester-coton overalls of 550g, 61% retention rate, "high" drying temperature (85°C), with no cool
cycle, unit preheated for 3 min. at 85°C, loading/unloading time estimated at 2 min.
Check-out
Before leaving, put the appliance into operation and allow to run a
complete cycle. Watch to ensure that all burner system components
function correctly.
IMPORTANT
Tightness test after installation
The gas leak test is performed as follows :
1/ Paint pipe joints, pilot gas tubing connections and inspect outlets
with rich soap and water solution ; do not use an aggressive soap.
2/ Put the machine into service. Bubbles indicate a gas leak.
3/ Eliminate this leak.
NOTE : After all intervention, re-seal (red varnish) the following
adjustment organs :
- regulator of pressure.
In case of changing of gas, the stick for the adjustment has to be
modified.
Содержание FC48
Страница 1: ...05306004 GB 26 2019 Installation manual Finishing cabinet FC48 Translated from french ...
Страница 2: ......
Страница 34: ... ...
Страница 35: ... ...
Страница 36: ...Share more of our thinking at www electroluxprofessional com ...