
10/2010 - Art. Nr. 4200 1030 6900A
19
Gas valves and instruments groups
Basic construction
Installation and mounting of the gas
filter
The gas filter may be installed in any
desired position. Take care only to
observe the direction of flow of the gas
(arrow on filter housing). Make sure
there is adequate clearance to facilitate
the removal of the cover and
replacement of the filter cartridge.
Filter replacement
The filter cartridge should be replaced
by a new one as soon as a high pressure
drop is noticed. If a new filter cartridge is
not at hand it will be possible to wash the
filter mat in 40°C water adding some
light-duty detergent. Allow the mat to dry
before reinstallation.
NOTE:
For the installation of the filter
mat take care to observe the marking or
sticker.
en
Test burner
Depending on the country-specific
requirements, when installing steam
boilers it may be necessary to fit a test
burner to the gas train (e.g. in line with
directive TRD 412). This is used to vent
the gas pipes. The gas supply is
switched on by pressing the button (1).
The flow of gas brings in the required
amount of combustion air via the hole in
the body (3). The gas/air mixture is
routed towards the burner head (4) and
ignited manually at its opening. Gas is
supplied for as long as the button is
pressed and cut off when it is released.
Technical features:
• Types of gas:
Gas in accordance with sheet G 260/1
of the DVGW, gas families 1, 2, 3
• Ambient temperature: -15°C to +70°C
• Assembly position: vertical, facing
upwards
• Operating pressure up to: 500 mbar
Содержание N6.2400 G-R
Страница 26: ...10 2010 Art Nr 4200 1030 6900A 26...
Страница 27: ...10 2010 Art Nr 4200 1030 6900A 27...