47
Collector assembly
Installing the bottom rail
Vertical installation
(Sloped roof type A;
Flat roof types C and E)
•
Slide the prepared bottom rail into the
fasteners and clamp it down by tight-
ening the bolts.
Tightening torque: 25 Nm
•
Slide the next bottom rail into the fas-
teners and the bottom rail intercon-
necting plate. Push the bottom rails
together until they butt up against
each other. Clamp the bottom rails by
tightening the bolts.
Tightening torque: 25 Nm
Horizontal mounting (sloped roof
type B; façade type D)
•
Slide the prepared bottom rail into the
fasteners and hook it onto the mount-
ing bracket that prevents the bottom
rail from slipping. Make sure it is com-
pletely hooked in. Clamp the bottom
rails by tightening the bolts.
Tightening torque: 25 Nm
•
Slide the next bottom rail into the fas-
teners and the bottom rail intercon-
necting plate. Push the bottom rails
together until they butt up against
each other. Clamp the bottom rails by
tightening the bolts.
Tightening torque: 25 Nm
Содержание AURON B 15 DF
Страница 1: ...Operating manual For professional installers AURON with EDF evacuated tubes 04 2013 Art Nr 12 054 556...
Страница 40: ...40 Collector assembly Fa ade summary for type D 13 21 4 1 6 2 3 5 15 10 11 7 14 25...
Страница 52: ...52...
Страница 55: ...55 Troubleshooting problems and remedies Antifrogen SOL HT Antifrogen SOL HT and vent...
Страница 62: ...62...
Страница 63: ...63...