ELBE 207-SM Скачать руководство пользователя страница 5

 

FOTO 

It shows the output FOTO.AP (normally switched on, and if the photocells is engaged it switched off). 

COSTA

  It shows the output safety edge (normally switched on, and if the safety edge is engaged it switched off). 

DL6

 

It shows the state of the setting. 

 

Close the gate and check that LED stop, FOTO, FOTO. AP and COSTA are switched on; otherwise re-check the wiring. 

Trimmer description.

 

 

AMP

 

Anti-crushing (obstacle detection) adjustment, when the gate is moving. Moving more to the (-) = high 

sensitivity. A small obstacle detected, adjusted according to the local norms of safety. 

RALL.

 

Controls the speed during the slow part of the opening and closing.  IE. just before fully open and closed. 

Moving more to the (-) = slower. Moving more to the (-) = faster during this part. 

VELOC.

  This parameter controls the overall main speed of the gate and it should be adjusted according to the local 

norms of safety. Moving more to the (-) = slower. Moving more to the (-) = faster. 

 

Dip Switches SW1 & SW2 features.

 

 

S

W

ON 

OFF

 

1

 

Working only with 1 motor. Use input M1. 

Working with 2 motors (M1 + M2). 

2

 

Feature “close immediately” enable. When the gate is 

opening, as soon as the photocells are disengaged, the 

gate closes after 5 seconds.  

Feature “close immediately” disable. 

3

 

First push in an opposite way to release the electro-lock 

(for gates with electro-lock only). 

Push disable. 

4

 

Extra push while starting disable. 

Extra push of 2 seconds while starting. 

S

W

ON 

OFF

 

1

 

Residential feature enable (while opening the control 

panel does not accept any other Start impulse). When 

gate has opened, a Start impulse closes the gate 

without considering the automatic shutting set on it.

 

Residential feature disable. Step by step 

feature enable also during opening. 

Residential feature disable. Step by step feature 

enable also during opening. 

2

 

Enable the indicator of gate movement/position on 

inputs 10-11 (LOCK). 

Enable electro-lock on inputs 10-11 (LOCK ). 

3

 

Enable use of resistive safety edge of 8K2. 

Enable use of mechanical safety edge (N.C. Contact) 

Содержание 207-SM

Страница 1: ...to anyone who may need it and make sure that all involved personnel are aware of this Type of product The 207 control panel has been designed to control 1 or 2 operators 12VDC and a 24VDC version for...

Страница 2: ...circuit board 11 Automatic programming of working times and slowing speed 12 13 Manual programming of working times and slowing speed 14 Programming automation closing 15 16 Wireless Keypad Programmi...

Страница 3: ...dges are used on gates in all areas where a specific risk of trapping may occur especially where there is less than a 50cm gap behind a gate when fully open Resistor 8k2 ohm circuits are used where CA...

Страница 4: ...Output 24 VDCfor the flashing light 13 negative 14 positive 15 16 Output 24 VDC for accessories 15 positive 16 negative 17 18 Output 24Vdc for Motor 1 max 3A 19 20 Output 24Vdc for Motor 2 max 3A 21 2...

Страница 5: ...re to the slower Moving more to the faster 5 Dip Switches SW1 SW2 features S W 1 ON OFF 1 Working only with 1 motor Use input M1 Working with 2 motors M1 M2 2 Feature close immediately enable When the...

Страница 6: ...ant to store led DL6 switched off as confirmation that code has been stored You can store up to max 32 different codes for the Pedestrian 8 Remote control cancellation Cancellation of a single code st...

Страница 7: ...ansformer Cable Information Main Supply 230Vac 3 0Amp minimum Photocells Safety Edges and Viro Lock BT cable CW1128 with conduit recommended Motors 2 Core 1 5mm2 MIN With single motor SW1 1 needs to b...

Страница 8: ...tors have started the gate will not function If you are using two pairs of photocells as pictured the receivers should be crossed on opposite sides so that you do not have two receivers at the same si...

Страница 9: ...issioning to work One pair wiring FES 180 BIG 1 F Photocell Two pair wiring FES 180 BIG 1 F Photocell Remove this link when photocells are added The vertical jumpers should not be installed as the 909...

Страница 10: ...e power Turn the power back on again Press once the key fob that you previously learned in at step 2 and 3 Observe the direction that both gates move in at the start and then immediately turn the powe...

Страница 11: ...position The board automatically searches for the open gate position the gate for motor 1 opens and after 3 seconds fixed or preset delay the gate for motor 2 starts to open In order to protect the me...

Страница 12: ...ates move in at the start and then immediately turn the power off again The gate if that travels in an open direction is correct The gate that travels in a closing direction is incorrect Identify this...

Страница 13: ...ng press and release the P2 WORK the time between pressing WORK will determine the phase displacement interval for closing The door for motor 1 starts to close the LED flashes normally 16 Deceleration...

Страница 14: ...flash 2 Deleting automatic closing time Press and release the P1 BREAK button twice This sets the automatic closing waiting time to zero LED DL6 turns off PROGRAMMING RADIO CODE START CONTROL 1 Enter...

Страница 15: ...e 4 Dial in 00000 OK 99999 OK 5 5 Enter radio code programming for the START control On the 207C panel press and release the P3 button PROGR button The LED DL6 will start to flash Dial in the numbers...

Страница 16: ...5 5 Type in the new combination again 12345 6 To enter the code for the START control With the gate closed locate the P3 LEARN button and push the button once 7 While DL6 is flashing dial in the new c...

Страница 17: ...safety if necessary integrating those in the manual for installation of the door gate and give the user a copy Compile the proof book and give the user a copy see facsimile in Annex 1 Draft the EC de...

Страница 18: ...MACHINERY DIRECTIVE 98 37 EEC AND THE STANDARDS EN 13241 1 EN 12453 EN 12445 The risks listed below follow the sequence of the installation process These risks are those which are commonly present in...

Страница 19: ...force should be measured one leaf at a time Check that the values measured by the instrument are below those indicated in the graph Carry out the measurements in the following points L 50 300 and 500...

Страница 20: ...ective device in accordance with the standard EN 12978 for example a sensitive edge and repeat the measurement 5 Impact in the area of closure Figure 1 risk C F Install a pair of photocells recommende...

Страница 21: ...Use CE marked components and materials pursuant to the Low Voltage Directive 73 23 EEC F Carry out the electrical connections connection to the mains earth connections and relevant checks in accordanc...

Страница 22: ...afety devices installed 1 7 1 1 7 2 1 7 3 1 7 4 1 6 1 1 1 2 Integration principles for safety and information 20 Signalling equipment 21 Warnings 22 Marking 23 Operating instructions 23 Maintenance 24...

Отзывы: