background image

- 11 -

To make sure the installation of EK components was successful, we 
recommend you perform a leak test for 24 hours. When your loop 
is complete and filled with coolant, connect the pump to a PSU 
outside of your system. Do not connect power to any of the other 
components. Turn on the PSU and let the pump run continuously. 
It is normal for the coolant level to drop during this process as air 
collects in the distribution plate. Inspect all parts of the loop, and 
in the eventuality that coolant leaks, fix the issue and repeat the 
testing process. Ensure that all hardware is dry before the system is 
powered on in order to prevent any damage.

TESTING THE LOOP

STEP 1

Plug the 3-pin connector from the water block’s D-RGB LED light to 
the DRGB HEADER on the motherboard. The LED will work if the pin 
layout on the header is as follows: 

+5V, Digital, empty, Ground.

Please ensure that the arrow indicated on the connector is 
plugged into the +5V line as indicated on your motherboard. 
If you put the LED Diode to the 12V RGB HEADER you 
can damage the LEDs. Failure to do so will damage your 
motherboard or LED strip. 

D-RGB HEADER

RGB HEADER

STEP 1

CONNECTING THE D-RGB LED STRIP

Содержание 3831109901083

Страница 1: ...USER GUIDE EK Quantum Velocity AM5 Backplate...

Страница 2: ...incurred due to improper or inappropriate installation Before you start using this product please follow these basic guidelines Please carefully read the manual before beginning the installation proc...

Страница 3: ...4 BACKPLATE DIMENSIONS 5 PREPARING THE AM4 WATER BLOCK FOR UPGRADE 6 PREPARING THE AM5 MOTHERBOARD 7 INSTALLING THE WATER BLOCK 9 CONNECTING THE D RGB LED STRIP 11 TESTING THE LOOP 11 WARRANTY 12 SUPP...

Страница 4: ...4 BOX CONTENTS AM5 Backplate Allen Key 2 5 mm 1 pc TX20 L Shaped Wrench 1 pc Thermal grease 1 pc...

Страница 5: ...5 BACKPLATE DIMENSIONS 90 mm 60 mm 43 mm 53 mm 8 9 mm 7 6 mm 6 3 mm...

Страница 6: ...o put foam or soft material to lay a motherboard on STEP 1 If the EK Quantum Velocity2 AM4 water block is already installed remove the backplate from the motherboard s backside using Allen Key 2 5 mm...

Страница 7: ...away PREPARING THE AM5 MOTHERBOARD UNC 6 32 SCREW HOLD DOWN CLAMPS STEP 1 STEP 2 After removing the plastic hold downs additional four 4 Screws must be removed using provided TX20 L shaped wrench Afte...

Страница 8: ...he protective sticker from the AM5 Backplate STEP 4 Cleaning the CPU Wipe the IHS clean using a non abrasive cloth or Q tip as shown in the illustration STEP 3 STEP 4 IHS NON ABRASIVE CLOTH AM5 BACKPL...

Страница 9: ...motherboard STEP 1 INSTALLING THE WATER BLOCK STEP 5 Applying thermal compound Apply the enclosed thermal grease thermal compound on the CPU heat spreader IHS as shown in the image The layer of the t...

Страница 10: ...TEP 2 Secure the water block from the backside of the motherboard using the included Allen Key 2 5mm Start fastening the screws in a cross pattern Do not tighten fully until all of the screws are part...

Страница 11: ...that coolant leaks fix the issue and repeat the testing process Ensure that all hardware is dry before the system is powered on in order to prevent any damage TESTING THE LOOP STEP 1 Plug the 3 pin c...

Страница 12: ...n the instructions manual This warranty does not confer rights other than those expressly set out above and does not cover any claims for consequential loss or damage This warranty is offered as an ex...

Страница 13: ...spare parts or a new mounting mechanism please contact https www ekwb com customer support EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU SUPPORT AND SERVICE EKWaterBlocks EKWaterBlocks ekwaterblo...

Отзывы: