DK50 9x4VRT/M
10/2018
NP-DK50-9x4VRTM_ED-EN-2_10-2018
- 21-
Connect the hoses from the water
separator and the condensate drain from
the dryer to connectors at the canister
valves (Fig.11).
A G3/4” threaded ball valve is installed on
the compressed air outlet from the air
tank (Fig.12)
14. ELECTRICAL CONNECTIONS
Only a qualified electrician may install
electrical components!
The operator is obliged to provide
circuit protection for the equipment
per the specifications in valid
technical standards.
The product is delivered without a power
cord.
Connect the compressor module to the
dryer module using the W22 cable
(Fig. 14).
Connect the compressor module to
sensor B1 located on the air tank using
the W23 cable, which is terminated
with a valve connector.
(Fig.13, Fig. 15)
The manufacturer recommends protecting
cabling loose on the floor (W22 and W23)
with a cable bridge
Connect the power cord conductors to
the power terminals L1, L2, L3, N/BU/,
PE/GNYE/. (Fig. 16).
Recommended configuration of phase
conductors: L1-BN, L2-BK, L3-GY.
Cable type (minimum requirements) H05
VV-F_ 5G10
Route the power cord out of the enclosure as
illustrated (Fig.17)
Fig.12
Fig.11
Содержание DK50 9x4VRT/M
Страница 1: ...DK50 9x4VRT M User manual EN...
Страница 2: ...October 2018 Z_2195 2018 Chap 3 pgs 5...
Страница 22: ...DK50 9x4VRT M NP DK50 9x4VRTM_ED EN 2_10 2018 22 10 2018 Fig 13 Fig 14 Fig 15 Cable bridge...
Страница 42: ...DK50 9x4VRT M NP DK50 9x4VRTM_ED EN 2_10 2018 42 10 2018 ANNEX 22 MAPPING PARAMETERS...
Страница 43: ...DK50 9x4VRT M 10 2018 NP DK50 9x4VRTM_ED EN 2_10 2018 43...