3.4 SLD - AC Coupled PV System with Back-up Power Operation 

 

The single line diagram shown below is a representation of a typical installation configured for utility interactive and 
back-up power operation, with AC coupled PV connected to a critical load panel.  This drawing is a guideline only, 
and is not a substitute for a code compliant installation.  All components required for a code compliant installation 
are the responsibility of the licensed installer, including any additional circuit protection requirements not shown 
here.  

 

 

 
NOTES 

1.

 

The backup power bus must be electrically isolated from the main electrical bus.  Do not tap the neutral wires of the main 
and backup buses. A separate line, neutral, and ground must be run to each of the load and grid ports of the battery 
system.  Refer to the installation manual for wiring details. 

2.

 

Energy meter supports 1Ø and 3Ø configuration.  In the above case, the energy meter was removed from the PCS cabinet 
and relocated to the main panel. 

3.

 

3Ø service shown. For 1Ø service, do not populate L2, L3 ph components.  

4.

 

The battery system must be earth bonded to the building ground to meet lightning protection requirements. 

5.

 

The battery system load and grid ports are independently controlled circuits.  Should the electrical code require additional 
“line-of-sight” disconnects, a separate disconnect must be used for each of the grid and load ports.  The disconnects 
and/or circuit breakers must operate independently of each other, and not be ganged. 

6.

 

The PCS provides galvanic separation of AC and DC sources.  Overcurrent protection devices, RCD Type A (300 mA), are 
sufficient for protection of both AC Grid and AC load ports. 

7.

 

Total AC nameplate of PV not to exceed 5 kW.  String inverter shown for simplicity.  Multiple AC strings of micro-inverters 
permitted.  Any additional PV installed on the grid side of the battery system operates independently from the battery 
system, and is only limited by the interconnection requirements of the utility service provider. 

8.

 

The maximum conductor size permitted for the PCS grid port is 16 mm

2

, and maximum breaker rating of 63 Amp to 

protect the internal circuits of the PCS.  The ESS breaker rating and conductor size can be reduced, however, these 
parameters are subject to the total possible continuous output current of combined PV and ESS generation at the ESS grid 
breaker in the main electrical panel.  Variables that determine conductor sizing include; PV continuous output current 
rating connected to the ESS load terminal, total self-supply current to the main electrical panel (load connected PV plus 
ESS output),  and length of run from the ESS grid port to the main electrical panel (voltage drop).  Conductor sizing is the 
responsibility of the installer as per the actual installation, compliant to local / national electrical codes.  Refer to the 
technical data in section 17.1 for Maximum AC fault current and duration (short circuit). 

9.

 

The PCS short circuit withstand capacity is rated at 10 kA (1 second).  Circuit protection must not exceed this rating. 

*DRED:  Australia only. 

** See note 8. 

 

** See note 9. 

N  L3 L2 L1 

Main Bus

3

 

Emergency switching device

 

Figure 6: Single Line Diagram: Typical AC coupled PV system.

 

Содержание Evolve LFP AU - 14 kWh

Страница 1: ...olve LFP AU 14 kWh Evolve LFP AU 28 kWh Evolve LFP AU 42 kWh Grid Support Utility Interactive Inverter Integrated Lithium Battery For use only with battery model Pylontech US3000C Installation Start u...

Страница 2: ...Revision History Revision Date Status Author Comments 1 0 09 Jan 2023 Draft RWM Initial release...

Страница 3: ...the AC Grid output circuit CAUTION This equipment contains high energy lithium batteries Qualified and trained personnel should wear protective clothing and equipment when working inside the battery c...

Страница 4: ...GROUND BUS 13 5 2 DC NEGATIVE POWER TERMINAL ASSEMBLY 13 5 3 PREPARING BATTERY MODULES FOR INSTALLATION 14 5 4 MOUNTING AND GROUNDING THE BATTERY MODULES IN THE BATTERY CABINET 15 5 5 WIRING THE BATT...

Страница 5: ...l Settings Factory Default 31 17 2 BATTERY CABINET DATA 31 17 3 WIRE AND TORQUE RATINGS 31 17 4 THERMAL PERFORMANCE CHARGE DISCHARGE CURVES 32 APPENDIX A BATTERY EXPANSION CABINET INSTALLATION BATTERI...

Страница 6: ...the system for the system Contact the fire department or other required emergency response team Evacuate the area and if applicable follow your emergency evacuation plan if others are in proximity to...

Страница 7: ...nd hazards Only connect this product to a compatible electrical service as defined in the model specifications This product must be connected to a dedicated branch circuit in the main electrical panel...

Страница 8: ...via CT monitoring or via compatible communication protocols with a select list of PV inverter models Consult Eguana Technologies for the most recent list of PV inverters with direct communication to t...

Страница 9: ...present please contact your local distributor The energy meter is supplied inside the PCS cabinet but can be relocated to the electrical panel Item Eguana P N Description 1 ACB05 PE PCS cabinet and c...

Страница 10: ...bracket includes attached battery retaining clip 801003044 PCS Cabinet 5 1 LP kit Incl levelling bracket cabinet coupler end plate plug and PCS BMS communication cable The PCS BMS cable provided will...

Страница 11: ...LK 400 mm WI0CUS300002 4 3 801003789 DC module jumper RED 180 mm WI0BSC100001 5 1 801003796 DC terminal jumper RED 400 mm WI0CUS300001 6 1 801003797 DC terminal jumper RED 700 mm WI0PUS300001 7 2 8010...

Страница 12: ...rench battery positive main power connection RJ 45 crimp tool EMS to PCS communication cable and RJ 45 connectors M8 mounting hardware for wall bracket load bearing 2 5 Inverter DSP Firmware Version T...

Страница 13: ...Refer to the environmental ratings in section 17 2 of this manual CAUTION Do not install in direct sunlight Battery performance is dependent upon operating ambient temperature Radiant heat absorbed i...

Страница 14: ...cted to the backup circuit 2 The example above is shown with the energy meter relocated from the PCS to the main electrical panel For installations where the energy meter is located within the PCS the...

Страница 15: ...he PCS provides galvanic separation of AC and DC sources Overcurrent protection devices RCD Type A 300 mA are sufficient for protection of both AC Grid and AC load ports 7 Total AC nameplate of PV not...

Страница 16: ...packaging and stand the cabinet upright Remove the front cover 3 Mount the two leveling brackets to the back side of the cabinet Each side of the cabinet must have a rubber washer in direct contact wi...

Страница 17: ...4 Place star washers on the bolts on the battery side of the cabinet 15 Mount the battery cabinet side coupling plate and fasten with the lock nuts Torque to 10 15 in lbs WARNING The mounting bolts of...

Страница 18: ...r termination is not covered by the manufacturer warranty 1 Mount the four ground wires provided in the battery module grounding kit into the 4 position ground distribution block 5 2 DC negative power...

Страница 19: ...nal is at the bottom of the module while the upper rack chassis ground terminal is at the top 1 not shown Remove a battery from its packaging Remove the rackmount ears if supplied with the battery 2 A...

Страница 20: ...binet 3 Repeat steps 1 and 2 above with the 2nd lower rack module 4 Mount the lower rack retaining clip 5 Install the battery rack partition bracket as shown using the two M5 keps nuts provided Note R...

Страница 21: ...tall the cables in the following sequence IMPORTANT All module interconnecting BMS jumpers terminate at the Linkport terminals Note the Linkport reference 0 an 1 for each port connection 1 Terminate t...

Страница 22: ...to as the Master battery module All other modules sync to the master 2 Model US3000C Terminate the PCS BMS Console Y cable jumper in the A CAN and Console ports of battery 1 3 Route the other end of t...

Страница 23: ...es referenced A3 should already be terminated at the cabinet DC terminal 1 Connect the DC power cables referenced A3 to the DC terminals of batteries 1 and 4 as shown Ref P N Description Pylon p n lab...

Страница 24: ...Torque to 15 in lbs 3 Terminate the DC power cables referenced B2 and B3 at the lower battery DC power posts as shown Mount only one cable per post 4 Mount the breaker assembly to the cabinet wall usi...

Страница 25: ...ttery or PCS cabinet renders the warranty null and void Use the knockouts provided at the bottom face of the PCS cabinet only Do not drill holes anywhere in the battery system Use conduit fitting redu...

Страница 26: ...bypass and transfer switch Each port must be connected to electrically isolated panels Tapping line or neutral wires from the main electrical panel to the backup panel will result in permanent damage...

Страница 27: ...energy meter supplied with the system The energy meter is supplied inside the PCS cabinet It can be relocated within or adjacent to the main electrical panel to simplify the current and voltage wiring...

Страница 28: ...uter A permanent Ethernet connection to the battery system requires external wiring Compliance with local electrical code is the responsibility of the installer Conduit and fittings connected to this...

Страница 29: ...ex 50 Discharge Show SOC ex 33 Alarm All other LEDs as per operating condition System error Protect mode DC bus not energized BMS power switch Powers the BMS only DC bus not energized Startup button P...

Страница 30: ...ifference in battery module SOC 1 Turn ON the BMS power switch to all battery modules in the cabinet 2 Press and hold the Start button on the master battery module for 0 5 seconds The master battery i...

Страница 31: ...gs are not available in the EMS monitoring app 13 PCS Display Panel 13 1 LED Display Indicators The PCS cabinet is equipped with a display panel that provides indication of the following Battery Opera...

Страница 32: ...result of this interruption a desktop or portable UPS is recommended if continuous operation is desired for any electronic devices IMPORTANT Surge rated loads i e power tools portable air conditioner...

Страница 33: ...fter being enerized Note De energize any home loads by shutting off the circuit breakers in the eletrical switchboard to increase the charge rate of the battery from the solar PV array Do not shut off...

Страница 34: ...the circuit breaker in the main electrical panel for the energy storage system Online monitoring system not accessible Check the internet connection If connection is via wi fi reboot the wireless rout...

Страница 35: ...e Active anti islanding method Sandia frequency shift Protective Class I II or III Class I Over Voltage Category OVC I II III or IV OVC III Inverter topology type Isolated Electrical data DC Nominal D...

Страница 36: ...ars Circuit protection integrated Breaker 180 Adc positive pole General data Width Depth Height 572 mm 397 mm 1041 mm Weight including two battery modules 145 kg Installation type Wall mount upright E...

Страница 37: ...ing AC Power Derating Full Range Derated 15 to 45 C 10 C 10 C 50 C 0 1000 2000 3000 4000 5000 6000 0 10 20 30 40 50 60 70 80 90 100 AC POWER VA SOC Evolve ESS AU Discharging AC Power Derating Full Ran...

Страница 38: ...ent should be inspected visually for any damage that may have been caused by shipment If damage is present please contact your local distributor A 1 1 LFP AU battery expansion materials list A 1 2 Exp...

Страница 39: ...K 1200 mm WI0CUS300006 5 3 801003789 DC module jumper RED 180 mm 1 spare WI0BSC100001 6 2 801003800 DC module jumper RED 1100 mm WI0CUS300007 7 2 801003799 DC terminal jumper RED 1200 mm WI0CUS300005...

Страница 40: ...lace with the cable referenced A5 in figure 30 below A 5 Battery module wiring 1 Connect the internal power and communication jumper cables as shown in sections 5 5 1 and 5 5 2 Note the relative posit...

Страница 41: ...ion of A4 B4 daisy chain jumper cables Note Battery module ground cables are one per battery with a home run to the cabinet chassis ground terminal Ref P N Description Ref P N Description A1 3790 DC m...

Страница 42: ...37 Appendix C Energy Meter Wiring Diagrams C 1 Eastron SDM630MCT 40mA RS 485 communication wiring CT wiring Voltage sense wiring EMS panel electrical block diagram...

Страница 43: ...38 INSTALLATION NOTES...

Страница 44: ...Eguana Technologies Inc Doc 95001Rev1 2022...

Отзывы: