E F A P O W E R E V - H C - I N S T A L L A T I O N A N D U S E R M A N U A L
11 | 28
5.3
HANDLING AND PLACING
Before installing stations
The instructions provided in this manual assume that the appropriate wiring, circuit protection, and
metering are in place at the installation location.
To assist in the process of preparing the installation site, it is recommended that before you begin
installing the Charging Station, you thoroughly review the contents of this document to familiarize
yourself with the required installation steps.
In case of any doubt regarding items described in this guide, please contact us at:
5.3.1
PACKAGING
EFAPOWER EV-HC Station is shipped in a personalized package (493x400x187mm), please refer to Figure 9. The Unit
dimension is in Technical characteristics - 2.1.
5.3.2
VISUAL INSPECTION
Check
if
the
exterior
case
has been
damaged
by mechanical impacts or any accidents during transportation
If applicable,
check
if
the EFAPOWER EV-HC Station
decor
is in
perfect
condition
Check
for proper Unit(s)
protective
ground
connection
point
, which should be interconnected with the low
voltage switchboard ground connection during the installation
5.3.3
HANDLING
Due to its weight (max 7kg), this Charging Station can be placed by one person.
Rua Eng. º Frederico Ulrich - Apartado 3078
4471-907 MOREIRA MAIA - PORTUGAL
Tel: (+351) 229403241 - Fax: (+351) 229403209
[email protected]
www.electricmobility.efacec.com
Figure 9 - EFAPOWER EV-HC Package