8

 

MAINTENANCE MANUAL

 

 

ALL SERVICING MUST BE PERFORMED ONLY BY QUALIFIED PERSONNEL. DO NOT ATTEMPT TO SERVICE THE 
EFAPOWER EV-HC STATION YOURSELF. 
BY  OPENING  THE  EFAPOWER  EV-HC 

STATION’S

  COVERS  YOU  RUN  RISK  OF  EXPOSURE  TO  DANGEROUS 

VOLTAGES! 
IN CASE OF ANY KIND OF DOUBT REGARDING THIS, PLEASE CONTACT: 

 

 

EFACEC  WILL  ASSUME  NEITHER  RESPONSIBILITY  NOR  LIABILITY  DUE  TO  INCORRECT  OPERATION  OR 
MANIPULATION OF THE EFAPOWER EV-HC STATION. 
 

After  discovering  any  malfunction,  please  check  the  troubleshooting  section  8.2  of  this  manual,  and  act 
accordingly to reach a resolution. If none of the actions solved the malfunction, please contact the local technical 
support. 
Equipment identification and detail description of the malfunction will be required for the remote support.  
 
Please note that Efacec does not refund travel or shipping expenses. 
The company does not hold any responsibility for any damages caused after the warranty period, but will gladly 
provide its customers with any technical consulting. 

 

8.1

 

PREVENTIVE MAINTENANCE 

 
This equipment must be kept in perfect condition to guarantee a safe and efficient battery charge. Make sure 
dust and moisture are kept out of the EV-HC. 

 

It is also important to ensure that a complete test is carried out by a qualified technician on a yearly or bi-yearly 
basis. 

 

We advise to carry out the following verifications: 

 

Table 7 - EFAPOWER EV-HC Preventive Maintenance 

Operation

 

Periodicity 

Estimated time(min)

 

Tools

 

Visual checking of the installation 

Including 

AC input cables

: Check the 

tightening torque of the cable 
connections. 

Each 6 months 

10 

Standard Tools 
Torque wrench 

Check 

value of

 protective earth 

Each 6 months 

Multimeter 
Standard Tools 

Output cables

: check if the connectors, 

cables and its connections are in perfect 
condition. 

Each 6 months 

Standard Tools 
Torque wrench 

Test RCD 

by pressing the RCD test button

 

Each 6 months 

 

Standard Tools 

 

                

Rua Eng. º Frederico Ulrich - Apartado 3078 
4471-907 MOREIRA MAIA - PORTUGAL 
Tel: (+351) 229403241 - Fax: (+351) 229403209 
[email protected] 
www.electricmobility.efacec.com 
 

Содержание EFAPOWER EV HC G3

Страница 1: ...EFAPOWER EV HC G3 HOME CHARGING STATION Installation and User Manual...

Страница 2: ...rademarks or registered service marks of their respective owners Symbols Index The following symbols are used in this manual to prevent accidents which may occur as a result of incorrect use of the ch...

Страница 3: ...9 5 2 2 Surface Preparation 10 5 2 3 Resources for Installation 10 5 2 4 Site Verification and Inspection 10 5 3 HANDLING AND PLACING 11 5 3 1 Packaging 11 5 3 2 Visual Inspection 11 5 3 3 Handling 11...

Страница 4: ...constitute a contractual obligation No part of this document may be photocopied reproduced or translated to other language without the written consent from EFACEC In case of any doubt regarding a sub...

Страница 5: ...7kVA 7 4kVA 11kVA and 22kVA EFAPOWER EV HC station is user friendly and safe Different models are available with power plug or socket When equipped with a socket the power cord plug is coupled into it...

Страница 6: ...ing with GB T20234 2 CE Units Type 2 according to EN 62196 2 GB Units Mode 3 according with GB T20234 2 EV Connection to EVSE CE units EN 61851 1 and IEC 61851 1 Case B and IEC 61851 1 Case C GB units...

Страница 7: ...61851 22 Electric vehicle conductive charging system Part 22 AC Electric Vehicle Charging Station 10 EN IEC 61000 6 1 Electromagnetic compatibility EMC Part 6 1 Generic standards Immunity for residen...

Страница 8: ...s Figure 3 EFAPOWEREV HC 3 7Parts RFID if applicable Output connection 3 7kVA 7 4kVA Output signaling Meter if applicable RCD and CB if applicable left side front side EV XX G3 YY 0F 00 G KK ZZP ZZ Me...

Страница 9: ...plicable codes or safety standards This document describes the most commonly used installation and mounting scenarios If situations arise in which it is not possible to perform an installation followi...

Страница 10: ...t ensure that the Unit can operate reliably while remaining within the range of its operating specifications 5 1 1 LOCAL CONDITIONS EFAPOWER EV HC Station has a protection degree of IP54 This Unit is...

Страница 11: ...r very low temperatures it s recommended to provide additional protection either inside a building or a shelter or providing a roof protection for the Unit See example in Figure 6 Figure 6 EFAPOWEREV...

Страница 12: ...suppressor please refer Figure 7 and Figure 8 Depending on the output of the Unit we can have several scenarios for the circuit breaker to be installed in the distribution board for each Unit The appr...

Страница 13: ...5mm2 4mm2 32 A 4mm2 4mm2 Tools Screwdriver for wall mount Crimping tool for power and earth cables Torque screwdriver with flat blade for input terminal blocks 5 2 4 SITE VERIFICATION AND INSPECTION C...

Страница 14: ...CKAGING EFAPOWER EV HC Station is shipped in a personalized package 493x400x187mm please refer to Figure 9 The Unit dimension is in Technical characteristics 2 1 5 3 2 VISUAL INSPECTION Check if the e...

Страница 15: ...t be hanging on the wires a Unplug the earth cable on it faston terminal b Unplug the flat cable on the board X14 c Unplug the card reader cable on the board X6 if applicable 3 Fix the Unit to the wal...

Страница 16: ...rs 5 3 4 2 and 5 3 4 3 EV HC11 EV HC22 Left grommet Charging Cable if applicable Middle grommet Input power cables refer chapters 5 3 4 2 and 5 3 4 3 Right grommet Communications refer chapter 5 3 4 4...

Страница 17: ...nected in accordance with the harmonized standards or local regulation The upstream protection is provided for the Unit To ensure protection to technicians during installation of the EFAPOWER EV HC pl...

Страница 18: ...Table 3 on page 9 5 3 4 4 COMMUNICATIONS IF APPLICABLE When applicable the communications on the EV HC shall be done through X2 double terminal marked with a red circle represented in both EV HC boxes...

Страница 19: ...e EV HC If it s not suitable the USB RS485 converter connected directly to the EV HC due to distance constraints alternative pre installation it s allowed Figure 15 A shielded communication cable of a...

Страница 20: ...n excel file ant therefore reports of charge associated to a specific RFID card can be generated ATTENTION There is a Maximum limit of the number of the chargers that can be connected this way 127 cha...

Страница 21: ...minal of the EV HC the respective RS 485 cables of the satellites network Is possible to have a network up to 25 satellite units In this solution the RFID card reader is only located on the Central Un...

Страница 22: ...ST NOT BE STARTED OR PUT INTO USE WITHOUT HAVING BEEN COMMISSIONED BY A FULLY TRAINED AND AUTHORIZED PERSON ALL SERVICING MUST BE PERFORMED ONLY BY QUALIFIED PERSONNEL DO NOT ATTEMPT TO SERVICE THE EF...

Страница 23: ...lever There is a test button for operation and differential protection test After connecting the charging station for the first time wait a few seconds and the EV HC Station should be ready to use AT...

Страница 24: ...pter 7 1 OUTPUT CONNECTOR EFAPOWER EV HC is prepared to charge electric vehicles according to the mentioned charging systems 7 1 1 TYPE 1 CONNECTOR Mode 3 7 1 2 TYPE 2 CONNECTOR Mode 3 7 1 3 TYPE GB C...

Страница 25: ...QUENCES FOR EV HC WITHOUT AUTHENTICATION The green light Ready indicates the EV HC is ready to be connected to a vehicle In the following figure is represented the operation sequence to start charging...

Страница 26: ...lowing figure is represented the stop charging sequence At this stage the station is ready to charge another vehicle NOTE If the user left the station charging and when returned light is blinking blue...

Страница 27: ...ith authentication or by disconnecting the cable from the car In the following figure are the sequences for each method NOTE If the user left the station charging and when returned light is blinking b...

Страница 28: ...damages caused after the warranty period but will gladly provide its customers with any technical consulting 8 1 PREVENTIVE MAINTENANCE This equipment must be kept in perfect condition to guarantee a...

Страница 29: ...D s EV HC without authentication The Homecharger is ready but the charging process didn t start The connector is not properly plugged into the vehicle Verify the correct connection to the vehicle The...

Страница 30: ...E F A P O W E R E V H C I N S T A L L A T I O N A N D U S E R M A N U A L 27 28 This Page Intentionally Left Blank...

Страница 31: ...E F A P O W E R E V H C I N S T A L L A T I O N A N D U S E R M A N U A L 28 28 This Page Intentionally Left Blank...

Страница 32: ...R EV HC G3 INSTALLATION AND USER MANUAL V 06 00 Rua Eng Frederico Ulrich Apartado 3078 4471 907 MOREIRA MAIA PORTUGAL Tel 351 229403241 Fax 351 229403209 serviceEEM efacec com www electricmobility efa...

Отзывы: