Important: 

Never “Hot Plug” any connector, this will result in internal damage to the electronics. 

Power down the system prior to plugging in any vehicle or tether connector. 

 

Note

:

  Never use WD-40 or similar solvent-based fluids on connectors or crawlers. These will cause the 

rubber parts of the connector or crawler to soften and swell rendering them inoperable. 

Impulse Connector: Lubrication and Cleaning 

 

Lubricate mating surfaces regularly with 3M Silicone spray or equivalent, DO NOT GREASE 

 

Lubricate O-rings with Molykote 111 silicone grease or equivalent.  

 

Use dust caps to protect connectors wherever possible 

 

Clean connectors with soap and fresh water, rinse out with alcohol and allow connector to air-
dry 

Fuse Replacement  

 

Refer to the ICON Portable Controller user manual for information regarding fuse replacement. 

Caution:

 Disconnect the power source before servicing or replacing fuses. 

 

Scheduled Maintenance and Servicing 

Picotrac™  crawlers  are  designed  to  provide  reliable  service  accompanied  by  a  minimum  downtime  for 
maintenance.  The frequency of maintenance and/or repairs will be largely dictated by the type of use and 
the  environments  the  units  are  subjected  to.  We  recommend  the  following  maintenance  procedures  in 
addition to normal equipment operational inspections.

 

Daily 

Daily or before each use of the Picotrac / Versatrax 50 units: 

1.  Visually inspect the Picotrac and track belt for damage; if the track belt is torn or stretched it may 

need to be replaced. 

2.  Check that the belt tensioning springs are freely moving.  This can be done by pulling up on the 

edge of the track belt with your thumb 

– the belt should have a small amount of give.  If the springs 

are bottomed out, there may be dirt under the belt which must be removed before deployment to 
avoid damage and to attain best performance.  

3.  Visually inspect the tether and interconnect cables or damage. If the cables are damaged the unit 

should be returned to the factory for servicing. 

Содержание Inuktun Versatrax 50 In-Line

Страница 1: ...2569 Kenworth Road Suite C Nanaimo BC V9T 3M4 CANADA 1 250 729 8080 info eddyfitechnologies com www eddyfitechnologies com INUKTUN VERSATRAX 50 In Line...

Страница 2: ...7 Power Requirements 7 Generators Inverters 7 Safety 7 System Setup 9 Working and Storage Environment 9 ICON Portable Controller Connection 9 Vehicle Tether Connection 9 Mini Reel Setup 9 Vehicle Con...

Страница 3: ...r Up Sequence 19 ICON ICON RPT 19 Maintenance 19 Connector Care 19 Impulse Connector Lubrication and Cleaning 20 Fuse Replacement 20 Scheduled Maintenance and Servicing 20 Daily 20 Weekly 21 Troublesh...

Страница 4: ...ght to change and or amend these specifications at any time without notice Customers will be notified of any changes to their equipment Information in this manual does not necessarily replace specific...

Страница 5: ...three track configurations The VT50 system can also be configured as a Spectrum 45 or Onyx Drop Camera Typical applications include Sewer and storm drains Air ducts Steam headers Tanks and pressure v...

Страница 6: ...ra Pipe Range VT50 50 102mm 2 4in Control System ICON Inuktun Control and Operations Software Vehicle Power Requirements 36 72VDC 30W System Power Requirements see ICON Controller Manual 110 240VAC 5...

Страница 7: ...nnected devices external monitors recording devices lighting etc when selecting a generator or inverter Safety In order to be able to use this product properly and safely every user must first read th...

Страница 8: ...maintaining the vehicle WARNING High Voltage 36 70 VDC Disconnect the power source before servicing the product otherwise damage may result Eddyfi Technologies Inuktun equipment is used in many varie...

Страница 9: ...m storage temperatures are between 20 C to 60 C 4 F to 140 F ICON Portable Controller Connection The ICON Portable Controller supplies power to the tether and vehicle It provides a communication inter...

Страница 10: ...icle Configuration General Vehicle Assembly One Two or Three Tracks The Versatrax 50 ships disassembled for portability Its modular design can easily be configured to operate with one two or three tra...

Страница 11: ...sing another flexible push link Connect the integrated interconnect cable from the front track to the camera 6 Install the appropriate traction wheels and camera skids as discussed in the sections bel...

Страница 12: ...ke new bristles for the guide brushes to adapt to any specific size Brushes may be custom fit using the following procedure 1 Cut nylon line to length as outlined below or as needed for a specific siz...

Страница 13: ...2mm 3 34 inch 85mm IPN 3089278 Onyx Skid Installation An Inuktun Onyx camera is supplied standard with the VT50 In Line system To install the camera onto the vehicle and with reference to the figure b...

Страница 14: ...t cable on the front track 5 Power up the system so the operator can observe the video on the screen 6 Place the Onyx camera into the skid with the face flush with the front of the skid Rotate the cam...

Страница 15: ...tion of the skid in the figure below A groove at the back of the skid captures it onto the camera mounting block while an open slot at the front allows for camera pan motion Drop Camera Configuration...

Страница 16: ...rconnects using standard cable ties as shown below Optional Traction Arm Springs The spring loaded VT50 traction arms have been optimized for a 2in 50mm pipe size If additional traction is required in...

Страница 17: ...Avoid loading the tether whenever possible Always use the Kellems grip strain relief if applicable to your system Regularly inspect the tether for damage Regularly clean the tether Note Protecting th...

Страница 18: ...ectories are set Test video recording Test track control Test camera control Post Operations Check A Post Ops inspection should be carried out after every deployment using the following checklist Insp...

Страница 19: ...ing are conducted through ICON RPT Manuals for these two software packages are included separately Controls for recording and snapshot functions are kept on screen with the camera controls ICON Manual...

Страница 20: ...anual for information regarding fuse replacement Caution Disconnect the power source before servicing or replacing fuses Scheduled Maintenance and Servicing Picotrac crawlers are designed to provide r...

Страница 21: ...ace box and computer Camera connector on vehicle is loose turn power off first before plugging in camera Check monitor input settings Vehicle power is not on Check for problems with other video compon...

Страница 22: ...tors run but the track doesn t turn there is a problem with the gearing or shaft pins Try changing tracks and update serial number configuration ICON will require a restart Reel Problems 1 Tether dist...

Страница 23: ...al number of the system component in question Eddyfi Robotics Inc Canadian Headquarters and Manufacturing Location 2569 Kenworth Road Suite C Nanaimo BC V9T 3M4 CANADA TF 1 877 468 5886 T 1 250 729 80...

Страница 24: ...until the correct paperwork is completed If cross border shipments are not labelled as per the instructions the items may be held by customs and issued additional fees All returned items must be sent...

Страница 25: ...ction to improperly wired AC receptacles 5 Track belts tethers view ports and other components subject to wear through abrasion are warranted to be free from defects in material and workmanship for a...

Отзывы: