- 8 -
maintenances; and also you shouldn't lay the pipelines and top-ray tubes on the unit. The
suggested installation location as below. (Unit: mm)
Unit should have adequate drainage measures in the vicinity, so that the system stops running or
maintenance of the water drainage system.
Picture 4
②
②
②
②
Attention of moving machine
Fork lift stacker or crane is suggested to move the machine
;
The surrounding ambient temperature of unit during transportation must be among –25 to 55
Picture 5
While suspending the machine, crane cable must be tie to machine tightly, keeping the machine
horizontal.
disassemble the ground bolt in the pallet after the machine is well located, and take the pallet
pr oec t i ng c hi pboar d
c r ane c abl e
c r ane hook