- 7 -
.2.3
Figure dimension
A/C water inlet
A/C water outlet
Ground source
water outlet
Ground source
water inlet
heat water outlet
heat water inlet
Picture 3 CWM-15XB
3
Installation Instruction
.3.1
Installation
The installation must be done by qualified professionals. Make sure the
The installation must be done by qualified professionals. Make sure the
The installation must be done by qualified professionals. Make sure the
The installation must be done by qualified professionals. Make sure the
installation match
installation match
installation match
installation matching
ing
ing
ing the following conditions.
the following conditions.
the following conditions.
the following conditions.
The selection of installation location
The installation location must match the following conditions
:
Make sure the installation environment is open surrounding and good ventilation.
The machine may be installed above the ground, keeping enough space between the bottom
plate and ground. In order to assure draining water effectively. And the bracket must has enough
carrying capacity;
Hydraulic circle charged with clean water, no dust or oil. Soft water is recommended
;
Make sure that the unit operating noise will not impact the living of neighbor.
The unit must be installed firmly, and the bottom of unit must be horizontal (the gradient must
be less 5 degree)
Keep enough space between the machine and wall. It is convenient for unit's repairment and