29
a
e
n
il
d
a
o
L
5
Optional: only with off network function
B
e
n
il
d
a
o
L
6
C
e
n
il
d
a
o
L
7
N
e
n
il
d
a
o
L
8
+
V
P
9
Optional: only with photovoltaic function
-
V
P
0
1
w
o
r
d
n
u
o
r
G
1
1
w
o
r
o
r
e
Z
2
1
Communication cable wiring
Connect the network cable to the network port shown in the figure below
Picture 6-11 communication cable connection interface
Warning:
BESS is a three-phase three wire system, which can adopt different
topological grids.
When BESS is connected to different topology grids, it is recommended to
install different devices.
The specific installation should be subject to the requirements of local power
grid.
It is recommended to install different devices according to different grid topologies.
when the power grid is an IT system, it is recommended to install insulator monitoring (IM).
/ecoess.co.uk
Mobile : + 44 (0) 7729636318
Landline : + 44 (0)116 366 9980
Website : www.ecoess.co.uk
E-mail : [email protected]
72- Evington Road,
LE2 1HH Leicester, UK