27
Picture 6-7 Bottom view
Cable routing
Insert the cable from the hole at the bottom of the cabinet, and connect and fasten it in the order
shown in the figure below. The bolt is M8 * 16 bolt group, and the torque is required to be 10 ± 1 N.M
Picture 6-8 Position wiring diagram (front side)
/ecoess.co.uk
Mobile : + 44 (0) 7729636318
Landline : + 44 (0)116 366 9980
Website : www.ecoess.co.uk
E-mail : [email protected]
72- Evington Road,
LE2 1HH Leicester, UK