background image

17 

 

COMMISSIONING AND 
HANDOVER 

APPLIANCE CHECK 

 

Please  check  that  all  components  are  correctly 
assembled and working correctly.  

Ensure  the  Door  Catch  mechanism  is  adjusted 
correctly and the 12mm Rope Seals around the door 
are air tight and sealing.  

Ensure the Air Controls are working correctly.  

Eco  Ideal  Stoves  recommend  that  you  carry  out  a 
smoke  draw  test  to  check  the  soundness  of  the 
chimney/flue system and seals:  

Place  a  Smoke  Pellet  in  the  centre  of  the  Grate, 
ensure that all of the Air Controls are fully open and 
close the Door.  

The  smoke  should  now  be  drawn  up  the  chimney 
and  you  should  be  able  to  see  it  exit  from  the 
chimney/flue terminal.  

We recommend that you do this test with all of the 
windows  and  doors,  to  the  room  where  the 
appliance is fitted, closed.  

If there any adjoining room(s) that have an Extractor 
Fan  fitted,  open  the  adjoining  door  to  ensure  that 
the  chimney/flue  system is not compromised when 
the fan is operating.  

If  there  is  a  ceiling  fan  fitted  in  the  room  please 
operate  it  and  ensure  that  it  does  not  affect  the 
operation of the chimney/flue system.  

If  any  of  these  tests  fail,  please  re-check  the 
suitability  of  the  chimney/flue  system  together 
with the ventilation. 

 

A small fire can now be lit and allow the appliance to 
heat  up  slowly  ensuring  that  no  products  of 
combustion  enter  into  the  room.  When  the 
appliance  has  reached  working  temperature  open 
the Door and carry out a spillage test using a smoke 
match around the door opening.  

If  there  is  excessive  spillage  please  allow  the 
appliance  to  cool  and  then  re-check  the 
chimney/flue system and ventilation. 

Do  not  run  the  stove  at  full  output  for  at  least  24 
hours.  

On completion of the commissioning:  

Upon completion, allow a suitable period of time for 
any fire cement and mortar to dry out. A small fire 
may  then  be  lit  and  checked  to  ensure  the  smoke 
and fumes are taken from the stove up the chimney 
and  emitted  safely  to  atmosphere.  Do  not  run  the 
stove at full output for at least 24 hours.  

Please instruct the user on the safe operation of this 
appliance,  how  the  controls  work  and  basic 
maintenance requirements.  

Ensure that the operating instructions and appliance 
tools are left with the customer and the  check  lists 
have been filled out correctly.  

Please advise the customer on the correct use of the 
appliance  with  the  fuels  likely  to  be  used  on  the 
stove and warn them to use only the recommended 
fuels for the stove.  

Advise  the  user  on  what  to  do  should  smoke  or 
fumes be emitted from the stove.  

The user should be warned to use a fireguard to BS 
6539 in the presence of children, aged and/or infirm 
persons.  

Eco Ideal Stoves also recommend that a CO alarm is 
fitted into the room where the appliance is located. 

Содержание eco 4

Страница 1: ...1 JINECO04 REV I 12 03 15 eco 4 CVSEC04FM Instructions for Installation Operating Maintenance Servicing Approved for use in the United Kingdom and the Republic of Ireland...

Страница 2: ...authorised fuels Consumables are deemed to be Glass Seals Gaskets Grate Components Log Retainers Baffles and the surface finish of the appliance The Warranty will only be valid if the appliance is ins...

Страница 3: ...nd out if you are in a Smoke Control Area by contacting your Local Authority The Eco Ideal 4 has been fitted with a permanent bypass that prevents closure of the secondary air slider Removal of this w...

Страница 4: ...temperatures on or near this appliance Do not place furniture or other items within 1 metre of the front of this appliance See the note on material clearances on page 13 Extractor Fans and or Cooker...

Страница 5: ...the presence of children the elderly or the infirm The fireguard should be manufactured in accordance with BS8423 Fireguards for use with solid fuel appliances Do not Over Fire It is possible to fire...

Страница 6: ...arbon Monoxide Detector that conforms to the latest issue of BS EN 50292 is placed in the same room as the appliance The installation of such an alarm is not considered as a substitute for regular mai...

Страница 7: ...washers Slide the remaining gasket on to the studs of the flue collar or blanking plate and secure in place on the back plate Unless the optional flue damper is being fitted blank off the damper handl...

Страница 8: ...chimney is suspected of previously serving an open fire it must be swept again within a month of regular use to clear any soot that may have been dislodged due to the variation in combustion levels a...

Страница 9: ...derstood These instructions cover the basic principles to ensure satisfactory installation of the stove although detail may need slight modification to suit particular local site conditions In all cas...

Страница 10: ...0 013 0389 Air Supply The room or space containing this appliance should have purpose provided ventilation where necessary in accordance with Building Regulations Due consideration should be given to...

Страница 11: ...cannot be reached through the stove with baffle removed a soot door must be fitted in a suitable position Flue Draught If the draught exceeds the recommended maximum a draught stabiliser must be fitt...

Страница 12: ...material or tiles at least 12mm thick The hearth should extend at least 150 mm from the sides and rear of the stove and at least 225 mm from the front of the stove All non combustible walls closer tha...

Страница 13: ...unt of air can be increased by moving the slider to the right The slider can be unlocked from its position by twisting the control knob anti clockwise Once the slider is in the desired position it can...

Страница 14: ...aper dry sticks and or firelighters in the mode chosen either wood or solid mineral fuel Light the fire at the base leaving all air controls open Allow the fuel to reach a steady glow and build the fi...

Страница 15: ...down If you want to revive the fire it is recommended that the Primary Air control is open first and then open the secondary air slider REFUELING Add the new fuel to the fire and open both air contro...

Страница 16: ...apply in the smoke control area The Secretary of State for Environment Food and Rural Affairs has powers under the Act to authorise smokeless fuels or exempt appliances for use in smoke control areas...

Страница 17: ...heat up slowly ensuring that no products of combustion enter into the room When the appliance has reached working temperature open the Door and carry out a spillage test using a smoke match around th...

Страница 18: ...d with a heat resistant paint and this can be cleaned with a soft brush Do not clean whilst the stove is hot wait until it has cooled down At no point should any water based or other cleaning products...

Страница 19: ...e checked for potential obstructions by a competent person before lighting the stove DE ASHING De ashing should be carried out on a regular basis to avoid a buildup of ash and ensure sufficient primar...

Страница 20: ...ndows in the room where the appliance is fitted a strange smell when the appliance is lit or water leaking from the appliance Please consult with your installer if you are concerned in any way about t...

Страница 21: ...w FSJM05008SS Door Slider CH08003 Glass Gasket ECO06007 Door Handle Assembly ECO06ARRT005 Glass Clip HHR08164 Slider Knob HCE06059 Door Cover HEC07002 Door Glass ECO06008 Rope Sealing Kit SCPHCE09SDSK...

Страница 22: ...22 Body Assembly Spares...

Страница 23: ...escription Serial Number COMMISSIONING CHECK Complete Sign YES NO Does the chimney flue system meet the appropriate standard Has the chimney flue system been swept and passed the soundness test Has th...

Страница 24: ...Signature Signature 5th Service 6th Service Date of Service Date of Service Date of next Service Date of next Service Servicing Company Engineer Servicing Company Engineer Signature Signature 7th Ser...

Отзывы: