background image

10 

 

W

ARNING

A

 FAULTY INSTALLATION CAN CAUSE DANGER

,

 ILL HEALTH AND EVEN DEATH TO THE INHABITANTS AND POSSIBLY 

COMPROMISE THE STRUCTURE OF THE BUILDING

C

OMPETENT 

P

ERSONS 

S

CHEME

 

Members  of  the  following  schemes  may  self-certify  the  installation  of  this  stove.    If  the  installer  is  not  a 
member of one of these schemes, your local Building Control Department must approve the installation. 

Scheme

 

Web address

 

Telephone

 

APHC (Association of Plumbing and 
Heating Contractors (Certification) 
Limited 

www.aphc.co.uk

 

0121 711 5030 

Building Engineering Services 
Competence Accreditation (BESCA 
Limited) 

www.hvca.org.uk

 / 

www.besca.org.uk

 

0800 652 5533 

HETAS Ltd (Heating Equipment Testing 
and Approval Scheme) 

www.hetas.co.uk

 

01684 278170 

NAPIT Registration Ltd 

www.napit.org.uk

 

01623 811483 

NICEIC Group Ltd 

www.niceic.com

 

0870 013 0389 

 

Air Supply 

The room or space containing this appliance should 
have purpose provided ventilation (where 
necessary) in accordance with Building Regulations. 
 
Due  consideration  should  be  given  to  air 
requirements  for  any  other  appliance  in  the  same 
room or space. 
 
Any air opening must be kept clear from blockage 
or obstruction. 

 

Chimney 

The chimney height and the position of the chimney 
terminal should conform to Building Regulations. 
 

 
 
Check  that  the  chimney  is  in  good  condition,  dry, 
free  from cracks  and  obstructions.  The  diameter of 
the  flue  should  not  be  less  than  127mm  and  not 
more than 200mm. If any of these requirements are 
not met, the  chimney should be  lined by a suitable 
method. 

 

If  there  is  no  existing  chimney  then  either  a 
prefabricated  block  chimney  in  accordance  with 
Building  Regulations  Approved  Document  J,  or  a 
twin-walled  insulated  stainless  steel  flue  to  BS  EN 
1856 can be used. These chimneys must be fitted in 
accordance  with  the  manufacturer’s  instructions 
and Building Regulations.  
 

Содержание eco 4

Страница 1: ...1 JINECO04 REV I 12 03 15 eco 4 CVSEC04FM Instructions for Installation Operating Maintenance Servicing Approved for use in the United Kingdom and the Republic of Ireland...

Страница 2: ...authorised fuels Consumables are deemed to be Glass Seals Gaskets Grate Components Log Retainers Baffles and the surface finish of the appliance The Warranty will only be valid if the appliance is ins...

Страница 3: ...nd out if you are in a Smoke Control Area by contacting your Local Authority The Eco Ideal 4 has been fitted with a permanent bypass that prevents closure of the secondary air slider Removal of this w...

Страница 4: ...temperatures on or near this appliance Do not place furniture or other items within 1 metre of the front of this appliance See the note on material clearances on page 13 Extractor Fans and or Cooker...

Страница 5: ...the presence of children the elderly or the infirm The fireguard should be manufactured in accordance with BS8423 Fireguards for use with solid fuel appliances Do not Over Fire It is possible to fire...

Страница 6: ...arbon Monoxide Detector that conforms to the latest issue of BS EN 50292 is placed in the same room as the appliance The installation of such an alarm is not considered as a substitute for regular mai...

Страница 7: ...washers Slide the remaining gasket on to the studs of the flue collar or blanking plate and secure in place on the back plate Unless the optional flue damper is being fitted blank off the damper handl...

Страница 8: ...chimney is suspected of previously serving an open fire it must be swept again within a month of regular use to clear any soot that may have been dislodged due to the variation in combustion levels a...

Страница 9: ...derstood These instructions cover the basic principles to ensure satisfactory installation of the stove although detail may need slight modification to suit particular local site conditions In all cas...

Страница 10: ...0 013 0389 Air Supply The room or space containing this appliance should have purpose provided ventilation where necessary in accordance with Building Regulations Due consideration should be given to...

Страница 11: ...cannot be reached through the stove with baffle removed a soot door must be fitted in a suitable position Flue Draught If the draught exceeds the recommended maximum a draught stabiliser must be fitt...

Страница 12: ...material or tiles at least 12mm thick The hearth should extend at least 150 mm from the sides and rear of the stove and at least 225 mm from the front of the stove All non combustible walls closer tha...

Страница 13: ...unt of air can be increased by moving the slider to the right The slider can be unlocked from its position by twisting the control knob anti clockwise Once the slider is in the desired position it can...

Страница 14: ...aper dry sticks and or firelighters in the mode chosen either wood or solid mineral fuel Light the fire at the base leaving all air controls open Allow the fuel to reach a steady glow and build the fi...

Страница 15: ...down If you want to revive the fire it is recommended that the Primary Air control is open first and then open the secondary air slider REFUELING Add the new fuel to the fire and open both air contro...

Страница 16: ...apply in the smoke control area The Secretary of State for Environment Food and Rural Affairs has powers under the Act to authorise smokeless fuels or exempt appliances for use in smoke control areas...

Страница 17: ...heat up slowly ensuring that no products of combustion enter into the room When the appliance has reached working temperature open the Door and carry out a spillage test using a smoke match around th...

Страница 18: ...d with a heat resistant paint and this can be cleaned with a soft brush Do not clean whilst the stove is hot wait until it has cooled down At no point should any water based or other cleaning products...

Страница 19: ...e checked for potential obstructions by a competent person before lighting the stove DE ASHING De ashing should be carried out on a regular basis to avoid a buildup of ash and ensure sufficient primar...

Страница 20: ...ndows in the room where the appliance is fitted a strange smell when the appliance is lit or water leaking from the appliance Please consult with your installer if you are concerned in any way about t...

Страница 21: ...w FSJM05008SS Door Slider CH08003 Glass Gasket ECO06007 Door Handle Assembly ECO06ARRT005 Glass Clip HHR08164 Slider Knob HCE06059 Door Cover HEC07002 Door Glass ECO06008 Rope Sealing Kit SCPHCE09SDSK...

Страница 22: ...22 Body Assembly Spares...

Страница 23: ...escription Serial Number COMMISSIONING CHECK Complete Sign YES NO Does the chimney flue system meet the appropriate standard Has the chimney flue system been swept and passed the soundness test Has th...

Страница 24: ...Signature Signature 5th Service 6th Service Date of Service Date of Service Date of next Service Date of next Service Servicing Company Engineer Servicing Company Engineer Signature Signature 7th Ser...

Отзывы: