Install the combi model as close
as possible to the hot water taps to avoid
the hot water pipes from becoming too long.
This prevents long delays and unnecessary
waste of water.
When you are satisfied the location meets
all the required criteria mark out the wall for
required fixing points. Use the fixing
bracket as a template.
Figure 10
Fixing Dimensions
Check for horizontal and vertical alignment
and drill 4 holes as marked using a No.14
masonry drill.
Clear the surrounding area of any dust and
debris and secure the mounting frame to the
wall using suitable screws and plugs.
Locate the boiler on the mounting frame.
The appliance should be 10mm
off the wall measured at the base of the
panel. Failure to observe this will result in
condensate becoming trapped inside the
heat exchanger. Component failures as a
result of incorrect installation will not be
covered by the boilers normal warranty.
Please remember when using power tools
to take all necessary safety precautions and
always wear safety goggles.
17. Flues and Ventilation
The internal boiler flue system is
manufactured in P.P.S plastic and the flue
outlet may be connected to an external
P.P.S plastic or stainless steel flue system.
17.1
Maximum Flue Lengths
The flue materials, flue insulation, the
amount of vertical and horizontal pipe and
the amount of bends incorporated
determine the maximum permissible flue
length. The excess fan pressure available
for overcoming the frictional resistance of
the flue system is 100 p.a.
Page 18
eco hometec (uk) ltd.