Troubleshooting
Algas-SDI Operations & Maintenance Manual P/N 52632
6-39
3. INDIVIDUAL HEATER RESISTANCE TESTS
Remove the vaporizer bottom cover. Remove the wires and jumper bars from
the heater connections.
Figure 16 - Individual Heater Resistance Tests
Individual Heater Tests.wmf
Using the diagram above, check the individual heaters for correct resistance
using a low resistance scale.
See the Bussing Diagram for "Individual Heater
Resistance."
Check from each heater terminal to ground (shell). It should read 100 mega
ohms or more.
NOTE
If either reading is incorrect, consult with the factory for advice and
possible warranty.
OHM