Troubleshooting
6-48
Algas-SDI Operations & Maintenance Manual P/N 52632
Figure 25 - Common Liquid Carryover Boards ( P480 to P1280 )
NOTE: Refer to drawings that came with the vaporizer for wiring changes.
The configuration shown represents previous versions. Vaporizers built after September 2004 use a 4-
pole relay/s.
Liquid Carryover Boards.dxf