![Echo CGSL01AF1 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/echo/cgsl01af1/cgsl01af1_operators-manual_531456016.webp)
13
S
TATION
L
OOP
, F
IELD
Z
ONE
1,
AND
F
IELD
Z
ONE
2 C
HARGING
S
TATIONS
C
HAPTER
7
C
HARGING
S
TATION
I
NSTALLATION
P
ROCEDURE
the nut on the inside of the panel and tighten it onto the fitting. Allow 35.4 in. (400 mm) of wire on
the inside of the enclosure top.
11) Remove 0.4 in. (11 mm) of insulation from the end of each wire.
12) Insert a flat
‐
blade screwdriver into the small terminal block opening(s) to open the spring contact.
Install the 14 AWG AC wires (neutral
‐
white, line
‐
black, ground
‐
green) into their corresponding
large terminal block openings. Install one wire per terminal block opening. The stripped ends of the
1
‐
14 AWG AC wires
4
‐
Seal
2
‐
Liquid
‐
tight conduit
5
‐
Input panel
3
‐
Conduit connector
6
‐
Nut
35.4 in.
(400 mm)
3
4
1
2
3
5
6
3