![Echo CGSL01AF1 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/echo/cgsl01af1/cgsl01af1_operators-manual_531456014.webp)
11
S
TATION
L
OOP
, F
IELD
Z
ONE
1,
AND
F
IELD
Z
ONE
2 C
HARGING
S
TATIONS
C
HAPTER
7
C
HARGING
S
TATION
I
NSTALLATION
P
ROCEDURE
5)
Move the charging station to the final installation location. Place the front of the enclosure top
26.4 in. (670 mm) from the Station Loop, Field Zone 1, and Field Zone 2 peripheral wires.
6)
Route the Station Loop, Field Zone 1, and Field Zone 2 peripheral wires under the base and up
through a cord grip. Allow a minimum length of 15.7 in. (400 mm) of each peripheral wire inside the
enclosure top. Hand
‐
tighten the cord grips. Provide excess wire under the base for future reposi
‐
tioning.
1
‐
Front of enclosure top
3
‐
Field Zone 1 peripheral wire
2
‐
Station Loop peripheral wire
4
‐
Field Zone 2 peripheral wire
1
‐
Peripheral wire
28.3 in.
(720 mm)
1
4
3
2
15.7 in.
(400 mm)
2
1