![Echo CGSL01AF1 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/echo/cgsl01af1/cgsl01af1_operators-manual_531456013.webp)
10
S
TATION
L
OOP
, F
IELD
Z
ONE
1,
AND
F
IELD
Z
ONE
2 C
HARGING
S
TATIONS
C
HAPTER
7
C
HARGING
S
TATION
I
NSTALLATION
P
ROCEDURE
7. Charging Station Installation Procedure
IMPORTANT
:
Do not bend, warp, or crack the base during installation.
Follow all safety instructions. See
Safety Instructions
.
This procedure is a basic overview of the charging station installation. Each installation varies by applica
‐
tion. Consult your dealer for specific questions regarding installation.
7.1. Station Loop, Field Zone 1, and Field Zone 2 Charging Stations
1)
Clear debris, cut grass, or vegetation from the installation location.
2)
Remove the charging station from its packaging. Lift the charging station from the base, do not lift
it from the charging arm.
3)
Remove the M5 nuts (8X) from the base of the enclosure top and save for reassembly.
4)
Range Picker configuration only: Carefully lift and rotate the enclosure top 180°. Align the holes in
the enclosure top with the holes in the base. Place the enclosure top onto the base (ensure no wires
are pulled or pinched).