§4.5.1 Installation space 

Installation space of clamp on type transducer is inner edge distance of the two transducers(face 
to face),after inputing the required parameters in Menu,check the display on M25,that is the 
installation space. 

§4.5.2 Installation method     

The method has 2 kinds: V method,Z method 
Normaly,V method is suitable to the pipe diameters within the range: DN15-DN200mm .when 
using V method can not measure the signal or the signal is poor,try to use Z method that is 
suitable to the diameters are more than DN200mm or measuring cast iron. 

V method(commonly used method)   

Normaly,V method is standard installation method,convenient to use with precise 

measurement,when installation,the two transducers horizontally align,its centre line is horizontal 
with pipe axis line,suitable pipe diameter range to measure is DN15mm-DN400mm

 

 

 

 

Z method (the most commonly used method)   

When the pipe diameter is wide,or there are suspended matters in fluid,too thick scaling or 

liner inside pipe inner wall,that can make the flow meter can not work normaly and signal poor by 
using V method installation,so need to use Z method to install,its features are direct transfering 
without reflection(called sigle sound path),little signal attenuation. 

 

Attention:1,when installation,it is a must to clear the pipe area where to install 

transducers,showing metal color 

2,shield line of ultrasonic signal cable can not be connected,but not short circuit with positive 

Содержание TDS-100M

Страница 1: ...TDS 100M Manual 1 TDS 100M Ultrasonic Flowmeter User Manual Ver 18 0...

Страница 2: ...DS 100M Manual 2 ground line include upstream ground line and downstream ground line CONTENT 1 Must knows about TDS 100M 5 2 Introduction to TDS 100M 6 3 Menu Window Details 7 4 transducersinstallatio...

Страница 3: ...e software the parameters that TDS 100M needs to work properly could be downloaded by use of the RS232 port on the PC If your computer does not have a RS232 port you need to buy a USB RS232 converter...

Страница 4: ...y located on Menu 48 which shows the points of lines for the linearity correction function 0 stands for shutting off the function The default value is 0 Try to make sure that value is 0 so as to avoid...

Страница 5: ...RS232 and RS485 serial port 4 One or two analog inputs 5 Optional 4 20mA analog output 6 Two OCT output channels 7 Ability to measure sew water 8 4 kinds of different types of transducers can be used...

Страница 6: ...ate positive totalizer adjust the units in M30 M32 03 display instant flow rate negative totalizer adjust the units in M30 M32 04 display instant flow rate date time 05 display heat flow rate total he...

Страница 7: ...is 8 seconds when inputing accures displaying according to the inputing operation when there is no inputing operation it will automatically enter cycle displaying status detailed information in 3 1 4...

Страница 8: ...64 analogue input AI3 65 Analogue input AI4 66 Analogue input AI5 By inputing measuring range the flow meter will turn current signal into data range users need so display related analogue input that...

Страница 9: ...play the Reynolds number and the pipe coefficient diagn osis 95 Display positive negative heat quantity totaliser start cycle display function 0 Display the time of power on off and flow rate 1 Displa...

Страница 10: ...interference function little signal consumable ensure the device work well in longer term so the special signal cable supplied by factory is the best choice for you if using coaxial shielded radio fre...

Страница 11: ...perature and pressure on the installation point should be within the work ability of the transducers 6 Pay more attention to the pipe scaling in inner pipe wall do best to choose the pipe without scal...

Страница 12: ...east above 550mm width is more than D 550 2 mm cement pipe width is more than D 700 2 mm instrument well axial width L is more than D 1200mm when installing transducers avoid the place of flange weldi...

Страница 13: ...ucer installation method Before installation choose density pipe to install transducers and clean the installation area clear away rust paint anti rust layer it is the best to use angle grinder to pol...

Страница 14: ...llation method convenient to use with precise measurement when installation the two transducers horizontally align its centre line is horizontal with pipe axis line suitable pipe diameter range to mea...

Страница 15: ...directly Insertion B type for sement pipe Suitable diameter Above DN80mm Above DN80mm Installation room 550mm 700mm Fluid temperature 40 160 40 160 Transducer material 316L stainless steel 316L stainl...

Страница 16: ...between the vertical side of the fixed position paper and the extended line is A D Starting from A and along the edge of the position paper the length of half of the pipe perimeter is measured and th...

Страница 17: ...ll valves have been welded on the hoops These hoops are directly fixed on the pipe and make sure that the centers of the ball valves overlap A and B respectively Finally the ball valves should be clos...

Страница 18: ...seal the connection place 4 6 8 Length calculation of the part of transducer into the pipe inner wall Insertion style transducer is made of stainless steel by casting As the transducer s length A and...

Страница 19: ...s of the two transducers are face to face that is the holes for wires are in the same direction and either upward or downward 5 After the transducer is installed the screw mut should be screwed tightl...

Страница 20: ...14 20 360 105 75 55 2 14 4 16 25 390 115 85 65 3 14 4 16 32 450 140 100 76 3 18 4 18 40 2 5 500 150 110 84 3 18 4 20 50 200 160 125 100 3 18 4 22 65 200 180 145 120 3 18 4 24 80 225 195 160 135 3 18...

Страница 21: ...l quality is indicated as the Q value display on M90 that represent the receiving signal is good or not TDS 100M series use 00 99 digits to represent signal quality 00 represent the worst signal 99 re...

Страница 22: ...r environment electromagnetic interference or lower receiving signal then the flow rate displayed is poor not be able to work normaly for long time 4 after installation enter M26 to solidify parameter...

Страница 23: ...le to receive signal Loosen contact or not enough couplant between transducer and pipe surface Transducers installed improperly scaling on inner pipe wall is too thick new changed liner Make sure the...

Страница 24: ...K Empty pipe setup in M29 no liquid in pipe or wrong setup if there is liquid actually input 0 value in M29 Attention the codes of Q E displayed do not affect measurement only means current loop and...

Страница 25: ...trument A quotation will be sent to the customer before proceeding with the service 6 3 Software Upgrade Service We provide free of charge software upgrade services Please contact the factory for any...

Отзывы: