678/03.05.23/V2
P a g e
| 17
of 28
Ecco Stove | Foster House | 2 Redditch Road | Studley | B80 7AX | United Kingdom
T
| +44 (0) 1527 857 814
E
W
| www.eccostove.com
For all patents
–
See Addendum
The door glass may be cleaned of either grey transparent fly ash deposits or tar deposits from its inner
surface with a proprietary glass cleaner available from your retailer.
21. PAINT FINISHES
Paint finishes on your Eco Stove may produce a heavy chemical smell for a number of initial firings from
being newly painted.
You may colour co-ordinate your Eco Stove by painting its outer surfaces with non oil based or non-
flammable paints. (Certain paints may discolour however) .
22. ASSEMBLY
The Ecco Stove is delivered in 7 main structural parts: bottom section, grate section, left and right sides,
back section, baffle brick and top section.
Secondary points are two rear baffles (Vermiculite); vermiculite spacer blocks; one fixed front grate
plug. Two slide in vermiculite flueway dividers for left and right sides; one cast iron grate;
Eleven further non-structural parts are included being door section and frame; ash can; two lower
bottom section cleaning plugs; 4 top section cleaning plugs and 1 front lower top section airwash control
with spinner.
Six inner components are separate being back vermiculite tertiary airwash boards (two) and upper steel
top baffle.
One flue cleaning brush, one operating tool and one thermometer are included.
22a)
HEARTH CONSTRUCTIONAL
The Eco Stove must stand on a load bearing hearth capable of carrying 500 kg with an overall width of
678mm and depth of 525mm (allowing 50mm gap behind the stove) or to suit in-country requirements
if different from the above.
22b)
HEARTH (DECORATIVE)
Must extend 150mm either side or 225 mm in front of the Eco Stove as a minimum or to suit in country
requirements if different from the above.
APPLIANCE ASSEMBLY
Items shown with an * should be lifted in with a proprietary lifting frame.
All other items should be lifted by two or more people.