4
1-INTRODUCTION
First of all, we would like to thank you for choosing E.C.A brand. E.C.A. Proteus Premix condensing boilers
have been designed to meet for an efficient, safe and comfortable central heating and hot water
requirement. The Proteus Premix condensing boilers can possibly use natural gas or LPG according to the
desired fuel preference. There is no standard LPG models. LPG usage is only possible after gas conversion
in the field.
HM Model (Combi Boiler) :
Both Central Heating (CH) and Domestic Hot Water (DHW).
HCH Model (Heat Only) :
Only for Central Heating (CH).
HST Model (System Boiler) :
Both for Central Heating (CH) and Domestic Hot Water (DHW) with external
storage tank (not included).
The assembly and usage information of 24/30/35 kW Proteus Premix condensing boilers are available in
this manual. Detailed information have been provided in the guide regarding the technical specification of
the boiler, selection of the boiler location, fitting its water, gas, flue and electric supply connections, gas
conversion, maintenance information and solving of possible failures. Please carefully read the manual in
order to benefit from all the features of your boiler.
The Benchmark Checklist and Service Record Card are located at the back of the Operating Manual.
The Benchmark Checklist must be filled by gas safe engineer during installation.
Operating Manual and Service Manual must be handed over the user for future
operations.
Service Record Card must be filled by gas safe engineer and handed over the user
after each service operation and annual maintanence.
1.1
Installer’s Responsibility
The installer is responsible for the installation and initial start-up
of the boiler. Instructions are given below.
Check Operating and Service manuals and follow instructions before installation.
Carry out installation in compliance with the prevailing legislation and standarts.
Be sure that the system is flushed and inhibitor added.
Only gas safe engineer must operate the boiler.
Explain the user about installation and operation of boiler.
Fill the Comissioning Checklist.
Give all Operating and Service manuals to user.
The warranty certificate must be registered by gas safe engineer within 30 days after installation.