background image

TERMS AND CONDITIONS FOR WARRANTY of ECA Boiler: 

1.The  appliance  has  warranty  period  against  product  failures  in  condition  that  the  instructions  and
precautions in the documents delivered with the product are obeyed. These documents are operating-
installation manual and service (includes maintenance operation) manual. The warranty period will not
be  extended  in  case  of  repairing  or  replacing  any  product  or  part.  Manufacturer  might  introduce
additional warnings/documents in case needed and deliver with the product. These documents are also
binding for the products delivered with the additional documents.

2.The appliance has been used for which it is designed. Heating system inline with product capacity etc.

3.The installation must be carried out only by a registered Gas Safe installer. Benchmark Commissioning
checklist must be completed and left with the householder for future reference. Boiler must be registered
by either installer or homeowner within 30 days of installation to validate warranty. Should this condition
not be met the period of warranty will extend to only 12 months from date of manufacturing on the boiler
data plate (in case proof of purchase or benchmark commissioning checklist is not available).

4.At the end of each 12 month period, the boiler must be serviced by a Gas Safe registered engineer
according to service manual provided with the boiler. After service operation, Benchmark service record
sheet  must  be  completed  and  left  with  the  householder.  Should  this  condition  not  be  met  the  boiler
warranty will lapse.

5. If the boiler suffers a mechanical or an electrical breakdown please contact your gas safe
engineer on +44 800 640 9988

Our  normal  working  times,  excluding  Bank  Holidays  are:  8am 

– 5pm Monday to Friday, 8am  – 1pm 

Saturday,We will arrange for an engineer or appointed contractor,to inspect and repair, or where in our 
sole opinion repairis not economic, arrange to replace the boiler. 

6.We will not accept or reimburse the costs of any third party who undertakes any work carried on the 
product or fits parts, unless approval is given by the means mentioned in point 5 such work in advance 
of it being carried out. 

7.The boiler has to be installed at an accessible area where Engineers can perform servicing without
health and safety risk.

8.Cupboard  installations  must  provide  minimum  working  clearances  as  detailed  in  the  installation
manual. Homeowner will provide removal of cupboards, kitchen units or trims in order to gain access for
service.

9.The warranty does not apply:
a.If the boiler is removed from its place of installation and/or installation interfaces have been changed
without our prior consent.
b.E.C.A  will  not  accept  responsibility  for  damage  caused  by  faulty  installation,  neglect,  misuse  or
accidentaldamage, the non-observance of the instructions contained in the service manual.
c.To any defect, damage or breakdown caused by the installation and maintenance of the CH system.
d.Noisy boiler, cold spots on radiators, sludge in pipes and poor circulation of the central heating system
caused by any damage due to scaling, sludge or blockages as a result of hard water, scale, deposits,
damage,aggressive water or sludge due to corrosion. Subsequently maintenance and cleaning of the
system.
e.If the contact procedure defined in point 5 is not adhered to
f.To any other costs or expenses caused by or arising due to the breakdown of an E.C.A. Boiler.
g.Damage caused by faulty installation (boiler, flue system or condensate discharge), theft, tampering,
neglect, misuse, accident, fire, flood, explosion, lightning, storms, earthquake, frost or other bad weather
conditions.
h.To any costs incurred during delays in fixing reported faults.
i.Costs of each annual maintenance, including parts such as seals or electrodes replaced at this time
j.Any problems caused by inadequate supply of services such as electricity, gas or
water to the property.

40

 

Содержание PROTEUS PREMIX PPR Series

Страница 1: ...PROTEUS PREMIX PPR 24 30 35 HM HST HCH PROTEUS PREMIX CONDENSING BOILER OPERATING MANUAL INSTALLATION COMISSIONING...

Страница 2: ...urers and installers The purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in accordance with the manufacturer...

Страница 3: ...from Ambient Air Type C 23 7 3 Mounting the Combi Boiler 23 8 CONNECTIONS 24 8 1 Flue Connections 24 8 2 Condensate Discharge Connection 27 8 3 Gas and Water Connections 28 8 4 Electrical Connections...

Страница 4: ...rsion maintenance information and solving of possible failures Please carefully read the manual in order to benefit from all the features of your boiler The Benchmark Checklist and Service Record Card...

Страница 5: ...arameter Adjustment DHW Domestic Hot Water Reset NTC Negative Temperature Coefficient sensor Winter Mode RCD Residual Current Device Summer Mode ECV Emergency Control Valve Solar Panel Mode SEDBUK Sea...

Страница 6: ...gineer as soon as possible Do not place and use flammable and explosive liquid or materials around the boiler Keep materials such as water foam away from electrical connections during operations such...

Страница 7: ...t E C A for proper cabine sizes If boiler is located in an unheated area it must be connected to mains switched on and pressure of installation should be within operation range so that freeze protecti...

Страница 8: ...and similar purposes Primarily for use in plugs BS6891 Installation of low pressure gas pipe work up to 28mm R1 BS5546 Installation of gas hot water supplies for domestic purposes EN12828 Central hea...

Страница 9: ...oiler in operation late at night keeping water temperature of the heating circuit at low levels will ensure saving If you feel that the room temperature is high the radiator valves should be closed in...

Страница 10: ...cartonboard with dimensions of 735 x 345 x 490 HxWxD mm supported by upper and lower styrofoams Figure 1 Package Exploded View Table 4 Standard Package List STANDARD PACKAGE LIST 1 3 Bottom Top Styrof...

Страница 11: ...Exhaust Terminal 4 Sealing Gasket 60 or 80 9 Inner Wall Connection Flange 5 Sealing Gasket 100 or 125 10 Outer Wall Connection Flange EPDM Table 5 Flue Package List Figure 3 Isolating Valve Kit VALVE...

Страница 12: ...3 Bar Safety Valve 9 Pressure Sensor 10 Condensate Trap 11 Plated Heat Exchancer 12 Gas Valve 13 Return Manifold 14 Pump 15 Flexible Connection Hose 16 Expension Vessel 8L 17 Rainwater Hose 18 Rainwat...

Страница 13: ...ety Valve 9 Pressure Sensor 10 Condensate Trap 11 Gas Valve 12 Return Manifold 13 Pump 14 Flexible Connection Hose 15 Expension Vessel 8L 16 Expansion Tank Holder Bracket 17 Rainwater Hose 18 Rainwate...

Страница 14: ...added during installation 1 Main Exchanger 2 Mixer 3 Fan 4 Silencer 5 Pressure Sensor 6 Condensate Trap 7 Gas Valve 8 CH Return Temperature Sensor 9 CH Supply Temperature Sensor 10 Ignition Ionisatio...

Страница 15: ...ly ensured These safety systems are Flame Failure Safety System Boiler Over Heat Safety System 95 C DHW Domestic Hot Water Over Heat System 71 C High Water Pressure Protection System 3 bar Low Water P...

Страница 16: ...iency Class A A A Water Heating Energy Efficiency Class Load Profile Only HM A XL A XL A XL Rated Heat Output Prated kW 24 5 30 35 Seasonal Space Heating Energy Efficiency 92 2 92 92 9 Water Heating E...

Страница 17: ...288 Flue Lenghts C13 60 100 Max m 10 C13 80 125 Max m 20 C33 60 100 Max m 10 C33 80 125 Max m 20 Emission Values CO emission max capacity G20 ppm 250 300 CO emission min capacity G20 ppm 50 C02 ratio...

Страница 18: ...al Space Heating 92 2 92 92 9 Water Heating 83 6 82 8 82 8 Sound Power Level Lwa Indoors dB 49 Specific Precautions for Assembly Installation and Maintanence All specific precautions for installation...

Страница 19: ...on from fiche of solar device III The value of the mathematical expression 294 11 Prated whereby Prated is related to the preferential space heater IV The value of the mathematical expression 115 11 P...

Страница 20: ...ckage The energy efficiency of the package of products provided for in this fiche may not correspond to its actual energy efficiency once installed in a building as this efficiency is influenced by fu...

Страница 21: ...dimensioning of the products in relation to building size and characteristics I The value of the water heating energy efficiency of the combination heater expressed in II The value of the mathematica...

Страница 22: ...o not install your boilers in locations that will be exposed to direct sunlight Sunlight can cause color change on the exterior of your boiler over time Ambient temperature of boiler s installation lo...

Страница 23: ...ptable dimensions from the terminal to obstructions an ventilation openings must obey national and local requirements All horizontally fitted ducts air flue should be fitted 2 or 3 upwards incline to...

Страница 24: ...e inner pipe facing outwards should be inclined upward and the fresh air pipe outer pipe should be inclined downward When the original flue set is installed parallel to the ground the exhaust gas pipe...

Страница 25: ...or horizontal pipe 60 B Below an air vent 60 H Below the distance grille from the outside of the building 30 C Below rain channel 30 I Distance from the inner corner of the building 100 D Under the b...

Страница 26: ...Flue Kit 7006990073 80 125 CCB Flue Adapter 7006990067 80 125 76 cm CCB Horizontal Hermetic Flue Kit 7006990065 60 100 CCB Sloping Roof Adapter 7006990066 60 100 CCB Deck Roof Adapter 7006990061 60 10...

Страница 27: ...connected at least 2 5 downwards incline to ensure to a good flow It can not rise at any point along its length Condensate discharge must be installed correctly otherwise operation of the boiler will...

Страница 28: ...de according to the national and local instructions The boiler must be earthed and a standard 230 V AC 50 Hz supply is required CAUTION Disconnect power supply to prevent electrical shock before conne...

Страница 29: ...stat Programmable Digital Room Thermostat CM707 7006901313 Wireless 7006901501 Digital Room Thermostat DT90 7006902502 Digital Room Thermostat Wireless Programmable 7006902046 On Off Wired Room Thermo...

Страница 30: ...stat the bridged cable connection on the back of the control panel is removed and the outer air sensor is connected to free sockets on the terminal Figure 21 OTC Curve It can be provided as an option...

Страница 31: ...imer must be performed certainly by gas safe engineer Room thermostat connection is installed by after removing bridge circuit Outdoor sensor is installed by connecting its cables to free terminals Ti...

Страница 32: ...ESET Check water pressure on pressure indicator frequently and ensure that the pressure is between 1 5 and 2 bar when system is cold If the pressure drops frequently it means that there is a water lea...

Страница 33: ...light will be OFF after 1 minute Anti freeze function remains active 11 CONTROL PANEL Figure 23 Control Panel View 11 1 Functions of Buttons The control panel consists of the relevant elements as sho...

Страница 34: ...e unit will switch to Comfort mode C Domestic Hot Water Increase Temperature Button The temperature of the domestic water can be increased up to 65 C thanks to the domestic water temperature increase...

Страница 35: ...tive 11 3 3 Winter mode Radiator Heating If the boiler in the standby position is set to the winter position it will heat the water in the heating circuit until the domestic water is needed In the win...

Страница 36: ...e anti freeze function helps protect your boiler it does not protect your installation If the boiler will not be operated for a while in places where there is risk of freezing then it is necessary to...

Страница 37: ...nic card may be failed 1 Press reset button 2 If the error is still present or persists after reset notify gas safe engineer E09 Valve Feedback Error The gas valve may be failed 1 Press reset button 2...

Страница 38: ...is still present or persists after reset notify gas safe engineer F07 Over Temperature Error for Flue Gas It occurs when the temperature of the flue gas exceeds 95 C 1 Notify gas safe engineer F13 Re...

Страница 39: ...et notify gas safe engineer F52 Error on Temperature Sensor for DHW Temperature sensor for domestic water might be defective 1 Notify gas safe engineer F53 Error on Temperature Sensor for Flue Gas The...

Страница 40: ...or where in our sole opinion repairis not economic arrange to replace the boiler 6 We will not accept or reimburse the costs of any third party who undertakes any work carried on the product or fits p...

Страница 41: ...e provided or if we are unable to obtain clear and safe access to the property or product or if we have reason to believe that the health and safety of our engineer cannot be guaranteed f If chargable...

Страница 42: ...re that the heating system is clean Power flushing is the most efficient and effective method of cleaning a central heating system The principle is to create a powerful fresh water flow under controll...

Страница 43: ...43 15 ANNEXES 15 1 Characteristic Curve of Water Pressure Height of The Pump Pump Head Flow Rate 15 60 for 24 3 kW Models Graph 2 15 70 for 35 kW Model Graph 3...

Страница 44: ...6990251 IGNITION ELECTRODE CABLE 7006990120 HIGH VOLTAGE CABLE 7006990121 LOW VOLTAGE FAN CABLE 7006990174 LOW VOLTAGE FLOW SENSOR CABLE 7006990320 GAS ORRIFICE 24 kW 7006990688 GAS ORRIFICE 30 kW 700...

Страница 45: ...ired Thermostatic radiator valves Fitted Not required Automatic bypass to system Fitted Not required Boiler interlock Provided ALL SYSTEMS s instructions Yes What system cleaner was used What inhibito...

Страница 46: ...mpany name Telephone No Gas safe register No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 06 Date Engineer name Company name Telephone No Gas sa...

Страница 47: ...s m Mustafa Kemal Bulvar No 13 45030 MAN SA 90 236 213 00 21 90 236 213 08 SALES TECHNICAL SUPPORT Call Center Tel 44 800 640 9988 Office Tel 44 20 3978 1212 Act vat ng your quarantee s qu ck and s m...

Отзывы: