45
CONFIGURATION OF MASTER- SLAVE PRODUCTS, EBERG REQU R+ VERSION
In order to configure the MASTER-SLAVE of the REQU R+ version, see the specific paragraphs in the instructions
manual of the remote control.
3) ASSEMBLY CONCLUSION
After the connection, carefully arrange the terminal box and the cables in the proper compartment, insert the
ceramic heat exchanger (7) with related filters (8), placing it in the middle of the recessed tube (6) as shown in
the picture here below:
Fix the main unit (3), with its shutter (2) and the front cover (1) already mounted on it, on the internal wall-
mounting part (4i) until complete assembly. Make sure to install the main unit on the wall placing all the switches
in the top left.