74
Storage
The battery cabinet must be stored in a clean, secure environment with a temperature less than 104°F (40°C) and a
relative humidity less than 90% (non-condensing). Store the battery cabinet in its original shipping container if possible.
Charge the batteries for at least 24 hours prior to use. Do not rely on the battery cabinet to provide backup power to
connected equipment until the batteries are fully charged.
Note: If the UPS system remains off for an extended period of time, it should be turned on periodically to allow the
batteries to recharge. The UPS system should be turned on and the batteries should be recharged at least one
uninterrupted 24-hour period every 3 months. Failure to recharge the batteries periodically may cause irreversible
battery damage.
Service
Your product is covered by the warranty described in this manual. A variety of Extended Warranty and On-Site Service
Programs are also available. For more information on service, visit Tripplite.Eaton.com/support. Before returning your
product for service, follow these steps:
1. Review the installation and operation procedures in this manual to ensure that the service problem does not
originate from a misreading of the instructions.
2. If the problem continues, do not contact or return the product to the dealer. Instead, visit Tripplite.Eaton.com/
support.
3.
If the problem requires service, visit Tripplite.Eaton.com/support/rma-request
. From here you can request
a Returned Material Authorization (RMA) number, which is required for service. This simple on-line form will ask for
your unit’s model and serial numbers, along with other general purchaser information. The RMA number, along with
shipping instructions will be emailed to you. Any damages (direct, indirect, special or consequential) to the product
incurred during shipment to Eaton or an authorized service center are not covered under warranty. Products
shipped to Eaton or an authorized service center must have transportation charges prepaid. Mark the RMA number
on the outside of the package. If the product is within its warranty period, enclose a copy of your sales receipt. Return
the product for service using an insured carrier to the address given to you when you request the RMA.
8. Storage and Service
Содержание Smart Online S3M BP240V09
Страница 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Страница 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Страница 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Страница 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Страница 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Страница 121: ...121 5 Instalación Figura 5 41C Frente Capa 3 Capa 2 Capa 1 Atrás ...
Страница 124: ...124 5 Instalación Figura 5 44A 2 Retire las placas superior lado derecho y lado izquierdo Figura 5 44 ...
Страница 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Страница 196: ...196 5 Installation Figure 5 41C Avant Couche 3 Couche 2 Couche 1 Arrière ...
Страница 199: ...199 5 Installation Figure 5 44A 2 Retirer les plaques du haut de droite et de gauche Figure 5 44 ...
Страница 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...