8
Installation Guide
RE 2 Post Rack Assembly and Installation Guide Issue 1
Step -1
Ensure the RE 2 post frame is securely
fastened to the floor.
2 person assembly
- Person one offers
the cable manager to the RE 2 Post
frame whilst Person two passes the Item
-3 through the frame
(The fixing must pass through
the obround slot in the 2 Post frame)
into the Cable
manager securing on the inside of the
manager with a Item-4+5 then
FINGER
TIGHTEN. See figure-1
Step - 2
Fix the Cable manager in 3 places -
Top, Middle & Bottom.
Figure
-
1
Item 2
Item 3
Item 4
Item 5
Step - 3
Position the Cable Manager and Tighten all fixings
to
12
Nm (tol/-
2
Nm)
Step - 4
Repeat step 1-2 on the opposite side of the RE 2 Post rack