10
Installation Guide
RE 2 Post Rack Assembly and Installation Guide Issue 1
Step -1
Ensure the RE 2 Post
Rack frame is securely
fastened to the floor.
Remove the thumb
screws from spools
where fitted
See figure-1
Step - 2
Offer up a cable spool to the 2 holes in the
vertical rail (Note there are 5 positions
available on the rail). Thread on and
tighten the thumb nuts.
Figure
-
1
Step - 3
Repeat step 1-2 where required.