RE 2 Post Rack Assembly and Installation Guide Issue 1 

4. RE 2 Post Rack Adjustable Cable Spools

 

ITEM

 

DESCRIPTION

 

QTY

 

1

 

RE 2 POST RACK

 

1

 

2

 

ADJUSTABLE CABLE SPOOL

 

5 PER KIT

 

3

 

M5 THUMB NUTS

 

2 PER SPOOL

 

 

 

 

Содержание RE 2

Страница 1: ...1 Installation Guide RE 2 Post Rack Assembly and Installation Guide Issue 1 RE 2 Post Rack System...

Страница 2: ...Post Rack Assembly and Installation Guide Issue 1 TABLE OF CONTENTS SAFETY WARNINGS 3 Frame Assembly Guide 4 6 Vertical Cable Manager Assembly Guide 7 8 Adjustable Cable Spools 9 10 Vertical Cable Ba...

Страница 3: ...vy and ensure the 19 equipment is evenly loaded front to back in the RE 2 Post Rack see diagram below 4 WARNING It is the customer s responsibility to ensure that the floor has a structural load capac...

Страница 4: ...ssue 1 ITEM DESCRIPTION QTY 1 RE 2 POST VERTICAL MOUNTING RAIL 2 2 RE 2 POST BOTTOM ANGLE 2 3 RE 2 POST TOP ANGLE 2 4 M8 SHAKEPROOF WASHER 8 5 M8 x 20mm HEX HEAD BOLTS 8 6 BRACKET ASSEMBLY FOR PDU CAB...

Страница 5: ...Align the bottom angle holes with the holes in the vertical mounting rails Fasten using 4 x M8 washers and 4 x M8 x 20 Hex Head bolts then FINGER TIGHTEN Step 3 Place the top angle on the vertical mo...

Страница 6: ...xings to 12 Nm tolerance 2 Nm Step 6 The bottom angles need to be secured to the floor floor fixings not included Step 7 If required install the 2 Cable Basket PDU brackets to the RE 2 Post Rack verti...

Страница 7: ...mbly and Installation Guide Issue 1 3 RE 2 Post Rack Vertical Cable Manager Assembly Guide 4 1 2 3 5 2 4 3 5 4 3 5 ITEM DESCRIPTION QTY 1 RE 2 POST FRAME 1 2 RE CABLE MANAGER 2 3 M10 x 20 HEX HEAD BOL...

Страница 8: ...he Item 3 through the frame The fixing must pass through the obround slot in the 2 Post frame into the Cable manager securing on the inside of the manager with a Item 4 5 then FINGER TIGHTEN See figur...

Страница 9: ...n Guide RE 2 Post Rack Assembly and Installation Guide Issue 1 4 RE 2 Post Rack Adjustable Cable Spools ITEM DESCRIPTION QTY 1 RE 2 POST RACK 1 2 ADJUSTABLE CABLE SPOOL 5 PER KIT 3 M5 THUMB NUTS 2 PER...

Страница 10: ...Rack frame is securely fastened to the floor Remove the thumb screws from spools where fitted See figure 1 Step 2 Offer up a cable spool to the 2 holes in the vertical rail Note there are 5 positions...

Страница 11: ...r Step 3 Secure the cable basket to the bracket with the fixings and clamp plate supplied and tighten all fixings to 12Nm Step 2 Secure the bracket to the RE 2 Post Rack vertical mounting rail Please...

Страница 12: ...om This enables easy earth bonding from above or below Step 1 1 serrated nut and bolt kit is supplied as standard for the purpose of earth bonding see Fig 1 Locate this nut and bolt kit in the desired...

Страница 13: ...mation visit www eaton eu electrical Eaton Industries Manufacturing GmbH Electrical Sector EMEA Route de la Longeraie 7 1110 Morges Switzerland Copyright 2012 All rights reserved Changes to the produc...