Installation Guide  

 

 

 

 

 

 

RE 2 Post Rack Assembly and Installation Guide Issue 1 

6. RE 2 Post Rack Earth Bonding.

 

The RE 2 Post Rack vertical mounting rails have earth bonding 
holes at both top and bottom. This enables easy  earth bonding from 
above or below.  

 

Step - 1 

1 serrated nut and bolt kit is supplied as standard 

for the purpose of earth bonding (see Fig 1).  Locate this nut 
and bolt kit in the desired earth hole position and tighten 
to12Nm. 

 

Step - 2 

Attach a pre-terminated earth wire to the bolt, 

then the washer and nut and tighten to12Nm. 

Fig 1 

Rack Earth Stud position. Can 

be re-positioned to top. 

Содержание RE 2

Страница 1: ...1 Installation Guide RE 2 Post Rack Assembly and Installation Guide Issue 1 RE 2 Post Rack System...

Страница 2: ...Post Rack Assembly and Installation Guide Issue 1 TABLE OF CONTENTS SAFETY WARNINGS 3 Frame Assembly Guide 4 6 Vertical Cable Manager Assembly Guide 7 8 Adjustable Cable Spools 9 10 Vertical Cable Ba...

Страница 3: ...vy and ensure the 19 equipment is evenly loaded front to back in the RE 2 Post Rack see diagram below 4 WARNING It is the customer s responsibility to ensure that the floor has a structural load capac...

Страница 4: ...ssue 1 ITEM DESCRIPTION QTY 1 RE 2 POST VERTICAL MOUNTING RAIL 2 2 RE 2 POST BOTTOM ANGLE 2 3 RE 2 POST TOP ANGLE 2 4 M8 SHAKEPROOF WASHER 8 5 M8 x 20mm HEX HEAD BOLTS 8 6 BRACKET ASSEMBLY FOR PDU CAB...

Страница 5: ...Align the bottom angle holes with the holes in the vertical mounting rails Fasten using 4 x M8 washers and 4 x M8 x 20 Hex Head bolts then FINGER TIGHTEN Step 3 Place the top angle on the vertical mo...

Страница 6: ...xings to 12 Nm tolerance 2 Nm Step 6 The bottom angles need to be secured to the floor floor fixings not included Step 7 If required install the 2 Cable Basket PDU brackets to the RE 2 Post Rack verti...

Страница 7: ...mbly and Installation Guide Issue 1 3 RE 2 Post Rack Vertical Cable Manager Assembly Guide 4 1 2 3 5 2 4 3 5 4 3 5 ITEM DESCRIPTION QTY 1 RE 2 POST FRAME 1 2 RE CABLE MANAGER 2 3 M10 x 20 HEX HEAD BOL...

Страница 8: ...he Item 3 through the frame The fixing must pass through the obround slot in the 2 Post frame into the Cable manager securing on the inside of the manager with a Item 4 5 then FINGER TIGHTEN See figur...

Страница 9: ...n Guide RE 2 Post Rack Assembly and Installation Guide Issue 1 4 RE 2 Post Rack Adjustable Cable Spools ITEM DESCRIPTION QTY 1 RE 2 POST RACK 1 2 ADJUSTABLE CABLE SPOOL 5 PER KIT 3 M5 THUMB NUTS 2 PER...

Страница 10: ...Rack frame is securely fastened to the floor Remove the thumb screws from spools where fitted See figure 1 Step 2 Offer up a cable spool to the 2 holes in the vertical rail Note there are 5 positions...

Страница 11: ...r Step 3 Secure the cable basket to the bracket with the fixings and clamp plate supplied and tighten all fixings to 12Nm Step 2 Secure the bracket to the RE 2 Post Rack vertical mounting rail Please...

Страница 12: ...om This enables easy earth bonding from above or below Step 1 1 serrated nut and bolt kit is supplied as standard for the purpose of earth bonding see Fig 1 Locate this nut and bolt kit in the desired...

Страница 13: ...mation visit www eaton eu electrical Eaton Industries Manufacturing GmbH Electrical Sector EMEA Route de la Longeraie 7 1110 Morges Switzerland Copyright 2012 All rights reserved Changes to the produc...

Отзывы: